Skip to the record
The only place to find full transcripts.

Council archive · source document

Change to Existing Approval - OPW11/0116.01

of 52

Text shows just the words. Original shows the document exactly as it was published.

Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                   195 (MAl()


SmtahlP. gt"u\u~r




:~~~~~~~J~"_~=====,=~~==================~========:
                                -




                                                       ~             ~~                                                 ~

                                                    .("~.   ~~%~=- --~:::~~& ~[=========:=::====~====
                            CORI ROCK
                                                                      r         ARMOUR ROCK
                                                                            0"..0.411’(111")   8.~

                       O$
                            -
                                (/ ]!)III (1Il1nl
                                                                                                                  NSL




                                                                                       4.5




Figure 6: Proposed Rock Wall Cross Section


A review of original risk assessment has been undertaken to highlight any changes in the expected impacts associated with
the works.


Uncertainty

The proposed change to rock along a section of the structure will not substantially impact on the level of uncertainty and
monitoring is still required.

Variability in shoreline response

No change to expected variability along Dog Beach.


Channel Evolution I River Processes


The impacts of the proposed structure on river flows and river I shoreline evolution is expected to be equivalent to the
existing approved mega-container profile. While there is higher friction associated with permeable structures, previous
changes to these factors as part of the modelling did not reveal any significant impacts. As such, the increase in wall
permeability is not expected to have a noticeable change on river flows or channel evolution.




                                                                                                                             6

Used in these records

About this file

File size
40.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Change to Existing Approval - OPW11_0116.01.pdf · 40.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.