Change to Existing Approval - OPW11/0116.01

of 52

Text shows just the words. Original shows the document exactly as it was published.

Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                           r~




                                                                                                           /
Figure 3: Approved Wall and Groyne Layout [Annotated version of NRS-005]

                                                           B.cld’lo Rl .3m AHD IfTWII



                                                                               Arlllpal~ excavated pmhle
          Top of bank
                                                                               {rNly"8f)i
                                                                               _______________________________AAT
                                                                               -------------------------------~m
                                                                               -------------------------------~o

                                                                               ==============================~~S




                                                                 phon.11m geoteJCll~ lube with flap
                                                               lilttqwedl




Figure 4: Approved Wall Typical X-Section [NRS-007]

Further review of the preferred construction materials has revealed the following:
     .    The concems expressed by the contractor [see section 3] potentially reflect some additional disadvantages for use
          of sand-filled geotextile contianers in this location.
     .    Access along the nourished beach eliminates the need for clearing for access to the end of the Noosa River Spit.
     .    Discussion with Hastings St Association has resulted in an acceptable delivery timeframe (with deliveries being
          restricted to 9am   4pm Mon Sat). It is expected that deliveries will be limited to a 2-3 week period.
                              -          -




     .    There is limited usage of the foreshore in this location given the proximity of the main channel so being user-
          friendly is less critical in this location.
     .    The higher cost is offset by potential costs of re-establishment.
          While removal of rock is not as simple as sand-filled containers, it can be achieved in the event that this is required
          [although it is the intent that the works remain to protect Noosa R Spit in the long term).

After further review of the above and discussion with relevant agencies and stakeholders, it is proposed that a section of the
wall which is closest to the bank and exposed to the highest currents be constructed using rock [Figure 6 & Figure 7). A
revised construction methodology is included in the Concept Environment Management Plan [rev C].




                                                                                                                                b

Used in these records

About this file

File size
40.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Change to Existing Approval - OPW11_0116.01.pdf · 40.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.