RAL210017

of 13

Page text shows just the words. Original shows the document exactly as it was published.

                      *(Refer Advisory Note)
               25.    A clause must be included in the contract of sale for lot 10 which requires any future dwelling
                      to be constructed within the building envelope shown on the Approved Plans and in
                      accordance with Bushfire Hazard Assessment v2 report listed within this Decision Notice.
                      Flooding
               26.    The surface levels of all lots (excluding drainage reserves) must be constructed to provide
                      flood immunity. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular surface levels that are higher than each of the
                      following:
                         a.       the local 1%AEP flood level at year 2100 (plus freeboard)
                         b.       the regional 1%AEP flood level at year 2100 (plus freeboard)
               27.    An easement for drainage purposes must be registered against the title of proposed Lot 10
                      in favour of Council over the land area identified for easement South of the building envelope
                      on proposed Lot 10 on Plan 13010-PRO-10G, prepared by LSD, dated 17th December 2021
               28.    All works, including filling and compensatory excavation for floodplain storage, are to be
                      carried out generally in accordance with Section 2.2 of the Stormwater Management Report
                      prepared by Peak Urban dated 28 October 2021
                      Stormwater Drainage
               29.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works approval
                      and the Queensland Urban Drainage Manual, and must include in particular:
                         a.       extension of the site stormwater system to accommodate stormwater from Pavilion
                                  Street;
                         b.       cut off drains at the eastern interface of Lots 1 and 9 to intercept runoff from external
                                  properties, including registration of drainage easements over these drains in favour
                                  of the upslope properties;
                         c.       collection and discharge of stormwater to the proposed detention basin, including
                                  the provision of Level II inter-allotment drainage for lots which do not fall to the street
                                  and provision of kerb adapters for all new lots which do fall to the street
                         d.       the use of gravity stormwater drainage and not surcharge pits.
                         e.       Stormwater runoff from the development must be disposed of on-site without
                                  causing scour or damage to the subject site or any adjoining property.
                      Stormwater Quality
               30.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with an Operational Works approval and the latest version
                      of the Water Sensitive Urban Design Technical Design Guidelines for South East
                      Queensland, and must include in particular:
                         a.       stormwater quality treatment devices of a size and location generally in accordance
                                  with those shown in Stormwater Management Report prepared by Peak Urban
                                  dated 28 October 2021
                         b.       bioretention devices which:
                                   i. are designed generally in accordance with the Bioretention Technical Design
                                      Guidelines (Water by Design, 2012)
                                   ii. are designed generally in accordance with IPWEQA Standard Drawing No. DS-
                                       073, DS-075, DS-076, and DS-078
                                  iii. are provided with a free-draining outlet from the sub-soil drainage system




                                                                                                              Page 6 of 13
Document Set ID: 21808186
Version: 3, Version Date: 04/02/2022
Log in to download the original file

RAL210017.pdf · 211 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.