iv. incorporate a coarse sediment forebay designed generally in accordance with
IPWEQA Standard Drawing No. DS-075
31. Permanent educational signage must be erected to educate the residents of the development
about the function of the bioretention device(s). The dimensions, standard, presentation and
location of the educational signage must be in accordance with an Operational Works
approval.
Stormwater easement
32. Stormwater entering the 3-metre-wide easement adjacent to the southern boundary must be
directed to the waterway, the works must be undertaken in accordance with an Operational
Works approval
ENGINEERING
External Works
33. Pavilion Street must be upgraded for the length of its frontage to the subject site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. construction of kerb and channelling for the full frontage of the development site.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
New Roads
34. The new road shown on the Approved Plans must be constructed in accordance with the
conditions of this Decision Notice and dedicated as road reserve at no cost to Council.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
35. The new road must join smoothly with the existing formation of Pavilion Street. The works
must be undertaken in accordance with an Operational Works approval, generally in
accordance with TOD Consulting’s plan 21556-SK101: “Preliminary Design – General
Arrangement”, Rev C, dated 11/11/2021 and be designed and constructed in accordance
with Council’s Planning Scheme Policy 6 – Engineering Design Standards. The works must
include in particular:
a. reserve and formation widths to a “Local Road” standard;
b. sealing, drainage, kerbing and channelling;
c. construction of pedestrian footpaths in accordance with the conditions of this Decision
Notice;
d. installation of street and pathway lighting;
e. provision of sight distances adequate for the design speed of the road; and
f. signage and linemarking.
Property Access and Driveways
36. A residential driveway must be constructed to proposed Lots 4, 5, 6 and 10. The works must
be undertaken in accordance with an Operational Works approval.
37. Maintenance vehicle access to the proposed bio-basin must be constructed. The works must
be undertaken in accordance with an Operational Works approval.
Pedestrian and Bicycle Facilities
38. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. a 2 metre wide footpath within one side of the new road’s verge for the entire length of
the new road, connecting to the existing footpath on Pavilion Street;
Page 7 of 13
Document Set ID: 21808186
Version: 3, Version Date: 04/02/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original