RAL210017
b. 2 pram ramps in accordance with Council’s standard drawing SD:9006-Rev E, or the
revision applicable at the time of construction, allowing for safe pedestrian crossing of
the new road along Pavilion Street.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
39. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with an approval for Operational Works and the standards and requirements of
the relevant service provider.
40. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
41. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
42. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
43. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
44. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
45. All subdivisional works must be carried out in accordance with a Geotechnical Report (or part
thereof) prepared by a qualified person* and endorsed through an Operational Works
approval.
*(Refer to advisory Note)
Earthworks
46. All fill and associated batters must be undertaken in accordance with an Operational Works
approval and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
47. No retaining walls/earthworks are to be undertaken and/or constructed or occur, with only
minor works permitted that are necessary to facilitate the roadworks, stormwater
management, flood immunity for lot 10 and connection to services. The development must
be undertaken in a manner which responds to the site’s constraints such that the natural
landform is generally maintained. Any earthworks proposed must be detailed clearly in the
application for Operational Works and be limited in extent to the reasonable satisfaction of
Council.
Damage to Services and Assets
48. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Page 8 of 13
Document Set ID: 21808186
Version: 3, Version Date: 04/02/2022