ECM_10452652_v1_Decision Letter - Change to an Existing Approval - 010 2007 00000743 002 [As Published] · 142007.743.03
2007/743
12. This Development Permit lapses if the development has not happened by 8 August 2010,
unless application to extend the currency is approved by Council.
Environmental Health
13. The applicant shall comply with Condition 51 of Development Permit No. 2005/2291. As such,
waste bricks and concrete are to be segregated separately from other waste being transported
to the Noosaville Waste Transfer Station.
Land Development
14. The development shall be carried out generally in accordance with drawings Nos.
F06-012 2 of 21 Rev G dated 6 July 2007 by F3 Design and Architecture
F06-012 3 of 21 Rev G dated 6 July 2007 by F3 Design and Architecture
F06-012 4 of 21 Rev G dated 6 July 2007 by F3 Design and Architecture
F06-012 2 of 21 Rev E dated 28 May 2007 by F3 Design and Architecture
0127 – R01 Rev A dated 8 June 2006 by Contour Consulting Engineers
or as modified herein.
15. The driveway width within the Ventura Street road reserve between the kerb and channel and
the property boundary shall be a maximum width of 4.5 metres.
16. Roof and surface runoff connection to Council’s drainage system shall be generally as shown
on drawing No. 0127 – R01 Rev A dated 8 June 2006 by Contour Consulting Engineers. Roof
runoff shall be directed to the proposed rainwater tanks and the overflow from the tanks shall
be directed to the stormwater disposal system. In this regard a revised drainage plan signed
by the Design Engineer indicating the abovementioned changes shall be submitted to Council
for approval prior to the pre-start meeting.
17. A bikeway/footpath 1.5 metres wide shall be constructed across the full frontage of the
development. The footpath shall have a slip resistant surface. The alignment, of which, shall
be determined on site with Council’s Construction Technical Officer. The expansion joints in
any bikeway/footpath shall be “sawcut” not trowel jointed.
18. Install suitable root barrier where proposed trees are adjacent to paths, pavement etc in
accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
19. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
20. Council’s Construction Technical Officer - (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting regarding the civil
works.
21. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ECM_10452652_v1_Decision Letter - Change to an Existing Approval - 010 2007 00000743 002 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 61 KB (small file)
- File type
No other editions are linked here.