ECM_10452652_v1_Decision Letter - Change to an Existing Approval - 010 2007 00000743 002 [As Published] · 142007.743.03

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                         2007/743

22.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
23.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).         The consulting engineers are responsible for arranging all
      inspections, with Council’s Construction Technical Officer or nominated staff.
24.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
25.   Council standards shall apply to these works unless otherwise modified herein.
26.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager Land Development.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
      commencement of the use.
      In the case of any emergency the Council shall be entitled to rectify such damage at the cost
      of the Applicant, such cost being paid prior to the commencement of the use.
27.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
28.   Construction work and other associated activities are permitted only during the hours of
      7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public
      holidays, except where extended hours are approved by the Manager-Land Development or
      his nominee.
29.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
30.   Safe pedestrian access on Ventura Street shall be maintained at all times. Should footpath /
      road closures be necessary to carry out construction works, Council’s Construction Technical
      Officer (ph 0410 512 505) must be notified prior to the proposed closure.
31.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot“ fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing No. F06-012 2 of 21 Rev E dated 28 May 2007
      by F3 Design and Architecture, Council’s Manager – Land Development may request further
      controls to be installed should approved measures be inefficient.
32.   The Design Engineer shall supervise the construction of the infiltration system and at the
      completion of the works submit to Council certification stating that the works have been
      undertaken in accordance with the approved design and that the infiltration system has the
      capacity to cater for the runoff from the site without adversely affecting adjoining properties or
      any Council services or structures.


                                                                                       Page 4 of 8

Used in these records

About this file

File size
61 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

ECM_10452652_v1_Decision Letter - Change to an Existing Approval - 010 2007 00000743 002 [As Published].pdf · 61 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.