Original source · versioned page text
2023-02-13 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 13 FEBRUARY 2023
Easements
26. Unless otherwise agreed in writing by the relevant service provider, any public or
third-party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development. Any repair work which proposes to alter the alignment or
level of existing services and assets must first be referred to the relevant
service authority for approval.
DEMOLITION WORKS
Performance Bond
28. Security in the form of a cash bond or trading bank guarantee to the sum of
$15,000 must be submitted to Council prior to the issue of a Development Permit
for Building Works for demolition, to secure the demolition conditions of this
approval. The cash bond or trading bank guarantee will be returned on
performance of the demolition conditions of this approval less any costs incurred
by Council in respect of enforcing performance of these demolition conditions.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Demolition must be undertaken in a manner that causes no detrimental effect
upon the amenity of the neighbourhood by reason of the creation of excessive
noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
odours) nuisance or any other emissions in accordance with the nuisance
provisions of the Environmental Protection Act 1994.
Waste Management
29. A Waste Management Plan (demolition) must be submitted in accordance with
Planning Scheme Policy PSP9 - Waste Management and approved by Council’s
Waste Coordinator prior to issue of a development permit for Building Works for
demolition, removal, or relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of
waste for the effective reuse and recycling of such materials. Segregated wastes
attract significantly reduced disposal fees at the landfill with some items free.
Higher gate fees are charged for mixed waste.
Waste storage areas must provide for adequate separation of all reusable,
recyclable and waste materials. These must be located so that they are
convenient and safe to use.
Page 6 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.