Council archive · source document
08/0175 - Response to Information Request - Koalas [As Published] · 132008.175
—s — —_—s = bear) =e ay) om 7 INTRODUCTION 1-2 - Corrective actions and contingency measures to be undertaken - Reporting Arrangements (including monthly reports to Council during construction) - Auditing Arrangements - How the requirements are to be incorporated into the construction and works contracts. - How the developers, employees, contractors and contractors employees will be informed and trained with respect to the environmental protection requirements - Enforcement; and Penalties for non compliance 74 In particular, but without limitation, the EMP shall address the following issues in relation to the construction and operational phases of the development: Legislative compliance Vegetation protection Fauna and Fauna Habitat Protection Aquatic ecosystem protection Weed control Pest control (particularly mosquitoes) Soil erosion and sediment contro! Water Quality Protection Groundwater Protection Air Quality Protection Acid Sulphate Soil Management Storage and Handling of Hazardous Substances Noise and Vibration Management Waste Management Cultural Heritage Management Visual Amenity Protection Bushfire Control Environmental Emergencies Community Liaison 75 The EMP shall apply to all works and activities on all areas of the site and adjacent road reserves (eg. all development, jetty construction and operation, ete."). 76 The EMP shall incorporate the requirement for monthly compliance monitoring and annual audit reports to be submitted to Council for the construction stages of the development. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following: 76.1 Include tables of the monitoring results (digital form should be in Excel). 76.2 Include individual charts Plotting the results for all parameters required in the monitoring. 76.3 Include a brief written discussion of the results and recommend any necessary actions. 77 The Applicant and all future owners of the site shall comply with the EMP. ee ' Jetty is now to be a Separate application and EMP. GADMIMB15184.G. DAMR,.B15184.007,05.DOC 22/7/05 OB:07 C: wem © OCEANICS AUSTRALIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.