Council archive · source document
08/0175 - Response to Information Request - Koalas [As Published] · 132008.175
INTRODUCTION I-3 1.2 Relationship to other management Plans a Conditions for the application require that a number of Management Plans are required to support the application. These plans are as follows: a 1. Environmental Management Plan (this plan). / WV ~tro_ _ Ecological Restoration Plan and Specifications , eC Le Fauna Management Plan. S fpr [/ l, , 2. 3. 4. Landscape Master Plan. 5. Fire Management Plan. Sh ry OUF 6. Construction Management Plan (including Traffic Management Plan). [ Mais Evy ‘7, Sediment and Erosion Control and Stormwater and Water Quality Management Plan. firs emp 8. Acid Sulphate Soils Management Plan. The Construction Management Plan (No.6), Sediment and Erosion Control and Stormwater and Water Quality Management Plan (No.7) and Acid Sulphate Soils Management Plan (No.8) are . integrated into this EMP. Aspects relating to the implementation of each of the above Plans prepared as separate documents (ie numbers 2 to 5) have been addressed within this EMP. In some cases, it will be necessary to refer to the original plan noted above for greater detail regarding management I procedures and methods of implementation (this will be cross-referenced in this document). All issues required to be addressed in Condition 75 have been addressed in the relevant sections of this EMP. Groundwater Protection and Environmental Emergencies have been addressed in Element C.5 and Section 1.8 respectively. t As noted in Section 1.1, three EMP’s have been Prepared for the total property with EMP3 covering ; all ecological restoration works to be undertaken on all portions of the property not covered by EMP 1 and 2 — see Figure 1-1. EMP 3 thus addresses those works to be undertaken by the proponent, | Settlers Cove Development Pty Ltd as shown on Figure 1-1 up until the following occur: 1, The RF Thompson Environmental Park land is deeded to the proposed Environmental ’ Organisation administered by Council in accordance with the Deed for transfer for the Environmental Park and until the end of the four year maintenance period; 2. The Public Esplanade is transferred to Council/Environmental Organisation and until the end of the four year maintenance period; 3. The four year maintenance period for the Park area is complete. This excludes the proposed stormwater treatment wetland which Council will maintain following its construction; 4. The POSCWP Areas are transferred to the individual Bodies Corporate where they are part of the RHD lots. The four year maintenance period for ecological restoration works applies to both the proponent and bodies corporate (upon sale of the individual lots) following practical completion. Outstanding works in the POSCWP areas in the RHD area can be bonded; 5. The individual RSL lots (incorporating the POSCWP areas) are sold. Ecological restoration areas will then be maintained by the private lot owner; and ‘GADMINAB15184.G.DAMIR.B15184.001.05.DOC 22/7/05 08:07 . OCEANICS AUSTRALIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.