HSTP Design · MCU26/0104
Design Calculations (The Disposal area is solely based upon the below calculation; no additional loads are to be connected. Additional bedrooms, buildings or residents could result in failure) Number of Buildings 1 Number of Bedrooms 4 Number of Persons (Max) 6 Adopted DIR 3 Litres per person per day (Tank supply) 120 Calculations 6x120 = 720/3=240 Minimum Disposal Area Required 240sqm (min) Available Reserve area 100% Type of Treatment The site is to be provided with an approved (By Department of Housing and Public Works) Advanced Secondary ASTP. The installer is to ensure the proposed final local of the system provides sufficient fall and does not cause audible disturbance to nearby residence. Disposal Area & Treatment Requirements The disposal area required is 240sqm (min). The irrigation area is to consist of pressure compensating dripper lines buried 150- 200mm deep and spaced approximately 800mm apart. The area is to be turfed or seeded post installation. The installer is to ensure the HSTP is located at least 150mm above any flood levels. The installer is to ensure the HSTP location does not cause damage to existing or proposed footing systems, the HSTP should be anchored to prevent flotation. All materials used are to be approved, fit for use and new. All pipework must be rated to 150% of the pump shut off. The HSTP is to be fitted with a discharge filter with a suitable aperture, to prevent blocking of the irrigation type installed. This should be accessible and cleaned regularly. All stormwater from upslope is to be diverted area from the area. 3 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
HSTP Design.pdfRelated documentApplication case desk ↗
About this file
- File size
- 882 KB (small file)
- File type
No other editions are linked here.