2019-12-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 DECEMBER 2019
Drawing No. Rev. Plan Date
2.1 C Ground Floor – Demolition, prepared by M Design 18.09.18
2.2 C Ground Floor Proposed, prepared by M Design 18.09.18
5.1 C Sections, prepared by M Design 18.09.18
P1 A Cover Page, prepared by Rienmac Pty Ltd 14.09.18
Sheet 1 of 3
P2 A Pool Plan, prepared by Rienmac* 14.09.18
Sheet 2 of 3
P3 A Details, prepared by Rienmac* 14.09.18
Sheet 3 of 3
*Note: The foundations are to be modified to comply with the Core Geotechnical
Consultants report dated, September 2019 (ref J000867-003-R-Rev 0).
Approved Documents
4. Development must be undertaken strictly in accordance with the approved documents
listed in the following table unless otherwise amended by these conditions.
Document
M Design & Fourteen Enterprises Pty Ltd (Appellants v Noosa Shire Council (Respondent),
Planning and Environment Appeal No.245 of 2019, Joint Expert Report dated 7 August 2019
including all Attachments:
Attachment 1
Working Notes: M Design and Fourteen Enterprises Pty Ltd as trustee v Noosa Shire
Council – 42 Seaview Terrace, Sunshine Beach, prepared by Omtrek dated July 2019;
and
Attachment 2
Geotechnical Report, proposed swimming pool 42 Seaview Terrace, Sunshine Beach,
Updated in Response to Joint Information Request by Coastal Engineering Experts,
prepared by Core Consultants Pty Ltd and dated 24 September 2019; and
Attachment 3
Core Consultants email advice of 27 September 2019; and
Attachment 4
Coastal Erosion Historic Assessments by Neil Collins
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Building Works. The cash bond or trading
bank guarantee will be returned on performance of the conditions of approval less any
costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Page 7 of 9