ii. 10pm to 7am: Maximum background + 3dB(A)
b. Pumps
i. 7am to 7pm: Maximum background + 5dB(A)
ii. 7pm to 10pm: Maximum background + 3dB(A)
iii. 10pm to 7am: No audible noise.
33. Air conditioning units and swimming pool filtration plant shall be located within
the undercover carpark.
34. Kitchen exhaust points for the development must be located and operated in
accordance with Australian Standard AS1668.2-2002 “The use of ventilation and
air-conditioning in buildings” (specifically Section 5.10 – Air Discharges).
35. Submission of written certification from a suitably qualified person confirming that
the noise levels from all mechanical equipment comply when measured at either
the residential boundary or outside the most exposed part of an affected building,
whichever is the closest to the equipment.
The assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building, and in a format approved
by Council. All equipment should be operating at the same time to test the overall
noise level created.
36. Entertainers or speakers used to amplify noise must not be located in any outdoor
area of the site including recreational areas (pool, space sundeck, and sun
lounges, multi-purpose/flexible lounge/outside deck).
Outdoor Lighting Devices
37. Lighting associated with the use must be designed, sited, installed and tested to
comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
obtrusive effects of outdoor lighting” using a control level of 1.
38. Certification must be submitted to Council from a qualified person which certifies
that all outdoor lighting devices comply with the requirements of this Decision
Notice at the time of commissioning.
For the purpose of certifying outdoor lighting devices for the development, a
qualified person is:
a. Registered Professional Engineer of Queensland;
b. an environmental or electrical design consultant with a minimum of 3 years
current experience in the field of outdoor lighting.
Building Demolition/Removal/Relocation
39. Where the development involves the removal, relocation or demolition of a
building, a Waste Management Plan (construction and demolition) in accordance
with Planning Scheme Policy 11, Waste Management Plans must be submitted
and approved by Council’s Environmental Health Officer prior to issue of a
development permit for operational works for demolition, removal or relocation of
any building other than a shed.
The purpose of the Waste Management Plan is to facilitate the segregation of
waste for the effective reuse and recycling of such materials. Segregated wastes
attract significantly reduced disposal fees at the landfill with some items free.
Higher gate fees are charged for mixed waste.
Waste storage areas must provide adequate separation of all reusable,
recyclable and waste materials. These must be located so that they are
convenient and safe to use.
Page 25 of 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.