Council archive · source document
Pearl and Elm St - Planning Report · MCU21/0117.01
23098/SKO2 B Concept Bulk Earthworks Plan Sectionsas 18.01.24 prepared by Morgan Consulting Engineers 23098/SK20 D Concept Services Plan as prepared by ‘Aug. 23 Morgan Consulting Engineers 23BRTO591-01 B Swept Path Analysis, prepared by TTM 20/12/23 Consulting 23098 -SBSMP/2 2 Site Based Stormwater Management Plan at 17 Jan 2024 5 Pearl Street Cooroy as prepared by Morgan Consulting Engineers 4.9 Proposed to delete condition 50 It is proposed to delete condition 50 as the stormwater management plan has been amended to incorporate a new management regime and the condition is no longer required. The roof runoff is discharged onto the ground where it sheet flows to the northeast corner of the site maintaining pre- development flow conditions and is a lawful point of discharge. SITE SPECIFIC CONDITIONS 4.10 Proposed change to condition 97 Proposed to change condition 97 to reflect the MCU condition. Landscaping A slight change to the driveway layout requires an amendment to condition 29 to read as follows. 29. A dense 2m minimum landscaped setback to the full length of the site's frontage to Pearl Street (excluding access, fence and bin enclosure). a. A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm Street. b. A dense Im minimum landscaped setback to all side boundaries (excluding stormwater infrastructure bir-enclesure-area-for U5-UF). c. The provision of 3 new street trees in accordance with PSP 2 — Landscaping. RG Strategic Planning Report — Minor Change Application 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pearl and Elm St - Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.