c. extension-ef the site stormwater system is to accommodate stormwater from Lot 1RP153798

external to the site, including registration of drainage easements over the site drainage
system in favour of Lot 1RP153798

 

e. the use of gravity stormwater drainage and not surcharge pits

35. Astormwater quality treatment system must be provided for the development. The works must
be undertaken in accordance with the Bioretention Technical Design Guidelines (Water by
Design, 2012), and must include in particular stormwater quality treatment devices of a size and
location generally in accordance with those shown inseetion 4.2 of the Stermwater Engineering
Repert prepared by RECOR dated 0341/2021 the Concept Drainage Plan 23098 / SK10 Revision

E prepared by Morgan Consulting Engineers dated 18.01.24

4.7 Proposed to delete conditions

Delete conditions 43, 44, 45, 46 and 47 as they appear superfluous as they mimic conditions 34, 35,

36, 37 and 38.

Operational Works approval OPW21/0199

Change the following conditions to reflect the amendments to the develooment.

4.8 Proposed change to condition 48

APPROVED PLANS

48. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless

otherwise amended by these conditions.

Plan No.
2101-COt

210H-CO2
210H-G20

210H-C36
210H-C40

23098/SKO1

RG Strategic

Rev.

B
B
B
D
B
A
A
cS

B

Plan/Document Name Date
CeverSheet andLoeality Plar-asprepared O3-November
by ReeerGensulting 2024
Bdstine F p 63
Reeer-Consutting 2024
Site Earthworks Plan-as prepared byReeer O3-November
Consulting 2024
Readworks and Drainage Layout Plan-es O3-November
prepearectey Recor Consutting 2024
Reacwerks-and Drainage Deteils-as O3Nevermber
preparectby RecerCensutting 2021
S Drei Sections 10h? O3
preparectby RecerCensutting 2021
S Drei Sect Dof2as 03
preparectby Recer-Censutting 2021
Turning f : R 03
‘Consulting 2024

Concept Bulk Earthworks Plan as prepared by18.01.24
Morgan Consulting Engineers

Planning Report — Minor Change Application

 

1

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Pearl and Elm St - Planning Report.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.