c. extension-ef the site stormwater system is to accommodate stormwater from Lot 1RP153798 external to the site, including registration of drainage easements over the site drainage system in favour of Lot 1RP153798 e. the use of gravity stormwater drainage and not surcharge pits 35. Astormwater quality treatment system must be provided for the development. The works must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water by Design, 2012), and must include in particular stormwater quality treatment devices of a size and location generally in accordance with those shown inseetion 4.2 of the Stermwater Engineering Repert prepared by RECOR dated 0341/2021 the Concept Drainage Plan 23098 / SK10 Revision E prepared by Morgan Consulting Engineers dated 18.01.24 4.7 Proposed to delete conditions Delete conditions 43, 44, 45, 46 and 47 as they appear superfluous as they mimic conditions 34, 35, 36, 37 and 38. Operational Works approval OPW21/0199 Change the following conditions to reflect the amendments to the develooment. 4.8 Proposed change to condition 48 APPROVED PLANS 48. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. 2101-COt 210H-CO2 210H-G20 210H-C36 210H-C40 23098/SKO1 RG Strategic Rev. B B B D B A A cS B Plan/Document Name Date CeverSheet andLoeality Plar-asprepared O3-November by ReeerGensulting 2024 Bdstine F p 63 Reeer-Consutting 2024 Site Earthworks Plan-as prepared byReeer O3-November Consulting 2024 Readworks and Drainage Layout Plan-es O3-November prepearectey Recor Consutting 2024 Reacwerks-and Drainage Deteils-as O3Nevermber preparectby RecerCensutting 2021 S Drei Sections 10h? O3 preparectby RecerCensutting 2021 S Drei Sect Dof2as 03 preparectby Recer-Censutting 2021 Turning f : R 03 ‘Consulting 2024 Concept Bulk Earthworks Plan as prepared by18.01.24 Morgan Consulting Engineers Planning Report — Minor Change Application 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pearl and Elm St - Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.