Council archive · source document
Pearl and Elm St - Planning Report · MCU21/0117.01
4.3Proposed Change to Condition 2 Change Condition 2 to read: 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date DAO1 O04 (Cover Page, prepared by Blackburne Jackson19-12-23 DAO2 O04 Location Plan & Notes, prepared by19-12-23 Blackburne Jackson DAO3 O04 Site Plan — Level 1& 2, prepared by Blackburne19-12-23 Jackson DAO4 O04 Floor Plan — Level 1, prepared by Blackburnel9-12-23 Jackson DAOS O04 Floor Plan — Level 2, prepared by Blackburnel9-12-23 Jackson DAO6 O04 Roof Plan, prepared by Blackburne Jackson 19-12-23 DAO7 O04 Elevations, prepared by Blackburne Jackson 19-12-23 DAO8 O04 Elevations, prepared by Blackburne Jackson 19-12-23 DAO9 O04 Sections, prepared by Blackburne Jackson —-19-12-23 DAI4 O04 Perspectives, prepared by Blackburnel9-12-23 Jackson DAI5 O04 Perspectives, prepared by Blackburnel9-12-23 Jackson LO1-01_D D Landscape Notes & Schedules, prepared by19-12-23 Blackburne Jackson LO3-01_D D Landscape Planting Plan, prepared by19-12-23 Blackburne Jackson LO3-02_D D Landscape Planting Plan, prepared by19-12-23 Blackburne Jackson RG Strategic Planning Report — Minor Change Application 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pearl and Elm St - Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.