Council archive · source document
2013-05-09 Negotiated Decision Notice Request (MCU12-0133) · MCU12/0133
Attached to the e-mail Representations for Negotiated Decision Notice.
Bligh Tanner Page 5 of 5
IMPERVIOUS AREAS FOR THE PURPOSES OF INFRASTRUCTURE CHARGES
Sunshine Coast Regional Council levies an infrastructure charge on new development to provide
trunk infrastructure. The stormwater network charge is based on the amount of impervious area
on a site, which ensures that the charge is proportional to the stormwater impact created by that
site.
According to Sunshine Coast Regional Council Adopted Infrastructure Charges Resolution (No.
2) 2011 Dated 7 December 2011:
‘impervious area means the area of the premises that is impervious to rainfall or overland
flow that results in the discharge of stormwater from the premises.’ (Page 8).
The above analyses demonstrate that the site is effectively pervious to rainfall and overland flow,
and that the development leads to:
• A net reduction in peak flow rates compared with its current pre-developed state.
• A net reduction in runoff volumes compared with its current pre-developed state.
• A net reduction in pollutants compared with its current pre-developed state.
Therefore, based on Council’s definition, the site has zero impervious area for the purposes of
calculating Infrastructure Charges.
Yours faithfully,
Alan Hoban
Principal Environmental Engineer
BLIGH TANNER PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2013-05-09 Negotiated Decision Notice Request (MCU12-0133).pdfRelated documentApplication case desk ↗
About this file
- File size
- 314 KB (small file)
- File type
No other editions are linked here.