Council archive · source document
2013-05-09 Negotiated Decision Notice Request (MCU12-0133) · MCU12/0133
Attached to the e-mail Representations for Negotiated Decision Notice.
Bligh Tanner Page 4 of 5
Figure 2 Cumulative frequency graph showing post development runoff rates are expected to be
lower than pre-development rates (note logarithmic axis).
STORMWATER CONNECTION AND LAWFUL POINT OF DISCHARGE
Development Condition #23 requires that ‘the site must be provided with a stormwater drainage
system connecting to a lawful point of discharge’
According to QUDM (2013 Provisional edition) Section 3.4 Lawful point of discharge:
A ‘lawful point of discharge’ test has been used by the industry to assess whether
discharge at a particular location is lawful. The test is focused on whether all applicable
regulatory and other legal requirements have been met or consent has been obtained to
allow stormwater to discharge in a particular location.
The term lawful point of discharge has no prescribed legal meaning, but it is commonly
used by the industry to refer to a point where the stormwater flow discharge is ‘lawful’.
Ensuring a lawful point of discharge exists will be necessary if stormwater discharge has
changed since the development was initially designed. This may not be the case where
the changes to discharge flows are not significant and happen in the natural and ordinary
use of the upstream property.
Where there is doubt as to whether a lawful point of discharge exists it is recommended
that it be sought (through the undertaking of a due diligence assessment and by obtaining
the required consents, approvals and/or tenure) in order to minimise the risk of legal
disputes arising with affected landowners or the local government.
Based on the analyses presented above, the requirement for a lawful point of discharge is
considered to be met by avoiding any increase in stormwater discharge, and allowing any
overland flows to pass across the allotment frontage as sheet flow into the road reserve as it does
in its current, undeveloped state. No formal connection to the piped drainage system, nor kerb
and channel drainage system, is necessary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2013-05-09 Negotiated Decision Notice Request (MCU12-0133).pdfRelated documentApplication case desk ↗
About this file
- File size
- 314 KB (small file)
- File type
No other editions are linked here.