07/1571 - Response to Information Request [As Published] · 142007.1571
MIDDAP DITCHFIELD BE ~ ~ AREHEFEC FS — 94 October 2007 Se Reoponre b> ooze 40005 Re ther Whe Noosa Council‘ PO Box 144 . TEWANTIN Q 4565 X RECEIVE a ATTN: Tracy Arthur | 03 OCT 2007 Project: Noosa Heads SLSC noosa sts cana Application for-Operational Works Your Ref2007/ 1571" Subject: Reply to RFI dated 6" September 2007 Dear Tracy, We refer to your letter dated 6 September 2007 and our meeting on 25% September and respond as follows:- Item 1 The surf club will lodge a $25,000 security with Noosa Council under separate cover Item 2 Bike racks are shown on landscape plan and architectural plan. Item 3 We attach Design Development Floor Plans for your information. Dwg DD 103 P5 shows folding and sliding doors on the north East verandah which will be lockable. Part of the Club Management Plan will be to close these at the required time each evening. Item 4 At an on site meeting with Surf Club Reps, Council Reps and Council Arborist Jeff Jakeman, it was agreed the Tuckeroo Tree behind the existing nippers would need to be removed. Refer Mark Bizzell adjusted plan. Item 5 Refer 0626-OP-1-K amended in accordance with agreement made at 25" September meeting. Surf Club to construct driveway and reinstate new footpath to match existing. Council to upgrade streetscape when VIC section of works is being done. Item 6 Refer documentation from Mark Bizzell ltem 7 Refer amended landscape plan for additional planting requirements. Item 8 Refer amended landscape plan for additional planting requirements. Item 9 Refer to Tods Revised drawings 06562 C2B for relocated grease /oil arrestor / gross pollutant trap. Item 10 Refer to Tods Revised drawing 06562 C2B IP OE i THO. 060606.000.66 Giati ¢ cate UictenCRaTIsOIAy Au CE EME MERHTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 49 pages
Page 2
Item 14 Item 12 Item 13 “Item 14 Item 15 Item 16 We trus' Refer to Tods revised drawings. The clearance at the gate is 2.2m Floor Level is RL 2.25 Uls of soffit is RL 4.45 As discussed on the 25 September meeting the Surf Clubs' Contractor will make application for site specific construction traffic and parking plan and confirm ail details at the pre start meeting. Refer Tods amended drawings for line marking and signage. Amended drawings indicate tank location. _ Refer attached report from Soil Surveys. t the above is satisfactory. Please call if you require any further information. Yours faithfully P & DITCHFIELD PTY LTD ARCHITECTS
Page 3
SOIL SURVEYS PROJECT NO. 305-2325 FEBRUARY, 2006 NOOSA HEADS SLSC GEOTECHNICAL INVESTIGATION SURF CLUB REDEVELOPMENT NOOSA HEADS SLSC HASTINGS STREET, NOOSA HEADS at
Page 4
~ y Soil Surveys Engineering Pty Limited Directors Wh} Specialists in Apptiad Geotechnics. A.B.N, 70 054 043 631 PJ Dixon BE(Hons) RPEQ . PR Cosh BE(Civil) CPEng MIE Aust RPEQ. www. soilsurveys.cam.au NT Perkins SAppSC(AppGeol} BEng(Hons1) MV Geale — BEng(Civil) MBA CPEng MIE Aust RPEQ . GEJ Gray SOIL SURVEYS P Elkington BE(Civil) Associates AM Rutten BE(Hons1) MEngSe LGE CPEng MIE Aust RPEQ SL Gamble BE(Geol) CPEng MIE Aust RPEQ Sunshine Coast Office REF: 305-2325 Author: Brett Egen 16" February, 2006 Noosa Heads SLSC PO Box 7 . NOOSA HEADS QLD 4567 ATTENTION: MR ROSS FISHER Dear Sir, 4 RE: GEOTECHNICAL INVESTIGATION - PROPOSED SURF CLUB REDEVELOPMENT NOOSA HEADS SLSC - HASTINGS STREET, NOOSA HEADS Enclosed is one copy of our report for the above project dated February, 2006. Three copies of the report have been issued; one copy to Tod Noosa Consulting Engineers and two copies to Noosa Heads SLSC. The report details the scope of the investigation works undertaken and provides discussion on existing ground conditions and recommendations on geotechnical design parameters to assist with the design and construction of the proposed surf club redevelopment. In addition, results from laboratory testing to assess the presence and severity of Acid Sulfate Soils (ASS) with recommendations to the management and treatment of ASS material. Should you have any queries regarding this report, please do not hesitate to contact Brett Egen or the undersigned at our Sunshine Coast Office. Yours faithfully, S.L. GAMBLE (RPEQ 6644) for and on behalf of SOIL SURVEYS ENGINEERING PTY LIMITED Brisbane Gold Coast Sunshine Coast Level 2, 19 Finchley Street ‘Unit 9, 38 Lawrence Drive 11 Production Avenue Millon Qid Nerang Qld Kawana Waters Qid PO Box 317 PO Box 2743 PO Box 2 Paddington Qld 4064 _ Nerang Qid 421+ - Buddina Old 4575 & mot - Australia . . Australia... eee Australia = > a ~ . . — Ph 617 3369 6000 Ph 647 5598 1528 Ph 617 5493 1980 i Fax 617 3369 6660 Fax 617 5578 3916. Fax'617 5493 2837 3 [email protected] [email protected] — sunshinecoast@sollsurveys,com.au
Page 5
i a § TABLE OF CONTENTS F.OINTRODUCTION cence vee vtvevvevee. 1 asco F GEOTEC E SERVICES Oo cercceen 1 3.0 PROPOSED DEVELOPMENT oceeeeeees 2 4.0 GEOTECHNICAL INVESTIGATION, 2 4.1 Site Description Lecce cess eeeeeeeenaes 2 feld investigation eevee eeeec eens: 2 4.3 Laborato BO eccecceeeseseecteneseeena eens 3 5.3.1 Preliminary Screening Tests 3 4.3.1 Quantitative Tests i leeees 4 ) 5.0 GEOTECHNICAL MODEL 5 SAGroundwater 6 8.0 ENGINEERING ASSESSMENT voceeecccees 7 §.1 Traffickability and Site Preparation 7 B.2 Earthworks i cecccceeceseveeeesuevess 7 6.2.4 Subgrade Preparation ae 7 6.2.2 Compaction Procedures & Specifications = 8 6.2.3 Excavation Characteristics 8 G2 Bate cece ccucuesuceeteceeeetaessenes 9 6.3 Building Foundations le eccecees ean es 9 a 40 6.3.3 Deep Foundations i ecceuee nes 10 6.3.4 Construction Considerations 11 48 FOUN ees 13 B41 Gomera cece ec cscs eeeeeeeteeeeees 13 G42 SU BASE ceccecsnssuesaseusenereetaees 13 6.5 Retainin Scene been cbt ce tbe eas 14 2.0 CONSTRUCTION INSPECTION nn, 14 8.0 ACID SULFATE SOILS ASSESSMENT 15 9.0 LIMITATIONS oo vvvvccecceccccceeeeeeeveves 16
Page 6
TABLE OF CONTENTS APPENDICES A Notes Relating to this Report B Borehole Records c Previous Borehole Records D Laboratory Test Results E Site Plan
Page 7
a a Project 305-2325 = 2006 NTI CTION This report presents the results of the geotechnical investigation carried out by Soil Surveys Engineering Pty. Limited at the site of the proposed surf clubhouse redevelopment at Noosa Heads SLSC; Hastings Street, Noosa Heads. The report details the scope of the investigation works undertaken and provides discussion on existing ground conditions and recommendations on geotechnical design parameters to assist with the design and construction of the proposed redevelopment. In addition, results from laboratory testing to assess the presence and severity of Acid Sulfate Soils (ASS) with recommendations to the management and treatment of ASS material. Results from previous geotechnical investigation carried out by. Soil Surveys and Exploration Pty Ltd (Report No. 90K/324, dated January 1991) in the area of the proposed redevelopment have also been reviewed in this investigation. Where appropriate, the information from the previous investigation have been included in this report. 2.0 - SCOPE OF GEOTECHNICAL SERVICES The scope of geotechnical services provided by Soil Surveys Engineering Pty. Limited was directed towards evaluating the following items as detailed in our proposal 305-2325 dated 21° November, 2005. f * Investigation of the subsurface profile by drilling, sampling and insitu testing with , three (3) boreholes. * Laboratory testing on selected samples to assess the geotechnical properties of the subsurface material. * Laboratory testing on samples obtained from three (3) boreholes to ‘a depth of 3.0m to assess the Acid Sulfate Soil properties of the subsurface material. * €ngineering analysis of site investigation and laboratory test results to evaluate:- - Site preparation and earthworks recommendations - Foundation parameters for design - Retaining wall design recommendations - Identification of Acid Sulfate Soils, (ASS) - Available management and treatment options of the ASS material. 2% SOIL SURVEYS ENGINEERING
Page 8
fox Project 305-2325 February, 2006 . Page 2 3.0 PROPOSED DEVELOPMENT a We understand that a staged redevelopment of the existing surf club is proposed, which is to involve the construction of a 3-storey extension to the east of the existing building, as part of Stage 1. Stage 2 of the redevelopment is understood to consist of the replacement of the existing building, which would be carried out at some later date. It is understood that the ground level of the new extension (Stage 1 Construction) would be set below the existing ground surface elevation on the northern side, requiring some excavation. It is estimated that the Stage 1 works would require less than 1,000m? of excavation. 4.0 G CHNICAL INVESTIGATION 4.1 Site Description —- , _ The existing Noosa Heads SLSC clubhouse is located on the northern/beach side of Hastings Street, Noosa Heads. At the time of the investigation the site was occupied by the existing surf clubhouse building. A grassed and sandy beach area is located to the northern side of the clubhouse and is separated from the beach by a concrete footpath. A small sand dune is located in the area of proposed extensions to the east of the clubhouse and is vegetated with grass and small trees/shrubs. The front of the site is occupied with footpath and carparking areas along Hastings Street. Subsurface conditions at the site were investigated by drilling and sampling a total of three (3) boreholes, consisting of two (2) deep boreholes to depths of 15.0m (BH3) and 20.2m (BH1) for deep profiling to weathered rock for a deep foundation system and one (1) shallow boreholes to a depth of 2.25m for acid sulfate soi! sampling. The fieldwork was conducted over three separate days using a track mounted Hydrapower drilling rig and a truck mounted Gemco HP7 drilling rig. In-situ testing consisted of standard penetration tests - SPT (Test Method AS.1289 6.3.1) and pocket penetrometer (PP) testing of undisturbed samples taken using 50mm diameter thin-wall tubes. - % SOW SURVEYS ENGINEERING -
Page 9
“ a sp % Project 305-2325 ——— February; 2006 - -- - = -- : -———Page.3 The positions of boreholes have been located over the site of the proposed redevelopment in order to provide representative coverage of subsurface conditions. The classification of soils in the field is subjective, based on the experience and judgement of the supervising geotechnician and some variations in the soil description, from the actual material type may occur. In order to reduce any inconsistencies which may have occurred, the field descriptions have been corrected, where appropriate, to reflect the available laboratory test results. The soil classification descriptions, field and laboratory testing were carried out in general accordance with the following Australian Standards. ‘ ¢ AS.1726 - 1993 ‘ Geotechnical Site Investigations * AS.1289 Methods of Testing Soils for Engineering Purposes * State Planning Policy 2/02 Planning and Managing Development Involving ~ Acid Sulfate Soils * Queensland Acid Sulfate Soils Investigation Team (QASSIT) “Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in Queensland” October 1998 (Revision 4.0). “Soil Management Guidelines’ November 2002 (Version 3.8). A description of the investigation method, borehole records and a site plan showing the location of the boreholes are included in the Appendices. 4.3 Laboratory Testing The scope of ASS testing has been carried out in accordance with the Guideline to State Planning Policy 2/02. Two stages of laboratory testing were undertaken for this project as part of the acid sulfate soil (ASS) testing program. A total of 34 No. soil samples were submitted to the staged ASS testing program. 5.3.1 Preliminary Screening Tests The first stage consisted of the initial qualitative screening of the disturbed samples, conducted using the field pH (pHr) and oxidised (pHrox) test method to provide preliminary assessment of the presence of Acid Sulfate Soils (ASS). This testing was in the form of assessing the pH of the sample before and following oxidation with 30% # SOIL SURVEYS ENGINEERING
Page 10
Project 305-2325 February, 2006 , Page 4 hydrogen peroxide (H202). This is a quick, qualitative-assessment of the potential acidity of the soil. Reactivity to hydrochloric acid (HCI) was also assessed as a qualitative determination of the neutralising carbonate content including calcium carbonate (shells) within the soil. Reaction to Hydrogen Peroxide was also assessed as a qualitative determination of oxidisable material. The results of these screening tests were used as an additional too! in determining which soil samples should be further assessed by quantitative laboratory testing. The pH values ranged from 5.7 to 9.2 (Avg. 8.2) with pHrox ranging from 3.6 to 6.0 (Avg. 5.0), and the full results for the pH and pHrox tests are presented in Appendix D. Where the measured pHr is <4, oxidation of the sulfides has probably occurred in the past, indicating the presence of Actual Acid Sulfate Soils (AASS). A pHr > 4 but <5 indicates an acid soil where the cause of the acidity needs further investigation. The PHrox test is used to indicate the presence of potential acid sulfate soils (PASS). If the PHrox <3 and a significant reaction with hydrogen peroxide has occurred, then it strongly indicates PASS and the more the pHrox drops below 3 the more positive the presence of sulfides. The lower the final pHrox result and the greater the difference between pHrox and pH, the more likely that PASS is present. | 4.3.1. Quantitative Tests The second stage of laboratory testing was carried out on a selection of samples showing the most severe potential acid sulphate readings, i.e. those showing low pH and large change between the pHr and the pHrox readings. The second stage of laboratory testing consisted of Chromium Reducible Sulfur (Scr) tests, and Titratable Actual Acidity (TAA) tests. The Scr test provides data on sulfuric acids, without influence from organic acids. The TAA test is a measure of the soils existing acidity prior to oxidation of sulfidic material. The results from the second stage quantitative ASS tests show negligible presence of oxidisable sulphur (<0.01 %S). Full results of the testing are summarised below in Table 1, and test report sheet is included in Appendix D. : # SOIL SURVEYS ENGINEERING ae.
Page 11
Project 305-2325 February, 2006 su oe 7 "Page § QUANTITATIVE TEST RESULTS SUMMARY Sank =e 0 BH1 2.5 - 2.75 0.01 0 BH2 1.0.- 1.25 0.01 0 BH2 1.5-1.75 0.00 0 BH3 1.0-1.25 0.00 0 BH3 2.0 - 2.25 0.01 0 5.0 GEOTECHNICAL MODEL The subsurface profile encountered in the boreholes consisted of fine to medium grained sands to depths of 9.5m (BH3) and 10.6m (BH1). The profife of sand density varied between the borehole locations. Borehole BH1, located adjacent to the beach, consisted of loose sand, becoming medium dense at a depth of 7.6m. Borehole BH3, located in the south-eastern carpark off Hastings Street, consisted predominately of medium dense sands to a depth of 9.5m. Stiff sandy/silty clay soils was encountered in borehole BH1 underlying the deep sand profile, to a depth of 17.45m. In borehole BH3, hard sandy clay was encountered underlying the sand profile and continued to a depth 11.0m. Extremely weathered sandstone was encountered underlying the stifffhard clays. The strength ‘of the sandstone was extremely weak, with bands of residual clay soils interbedded. Standard Penetration Test (SPT) results within the extremely weak and very weak sandstone, ranged between N=15 and N=33. SPT refusal was achieved at 20.2m depth in BH1 in very weak sandstone. A summary of the subsurface profile is presented in Table 2 with detailed borelogs included at the rear of this report. #% SOIL SURVEYS ENGINEERING
Page 12
Project 305-2325 February, 2006 TABLE 2 SUMMARY OF SUBSURFACE PROFILE aT: ER ee - Loose 0.00-4.50 - Loose to 4.50-7.60 Medium Dense - Medium Dense 7.60-10.60 - 0.00-9.50 CLAY - Stiff 40.60-17.45 ~- ad ~ Hard : - ~- 9.50-11.00 SANDSTONE _ |- Extremely Weak 17.45-TD - 11.00-14,00 - Very Weak - - 14.00-TD Termination Depth 20.20 2.25) 15.00 Notes:- 1) All depths in metres, below existing ground surface at time of investigation 2) Borehole BH2, effective “TC” auger refusal on boulder at termination depth. §.1 Groundwater Groundwater was only observed in borehole BH1 at a depth of 4.1m. The drilling methods used (water circulation) prevented the observation of groundwater below the open hole auger drilled sections in BH3. The groundwater level is expected to fluctuate with climatic conditions and may show a damped response to tidal variations due to the close proximity of the site to the beach. Seepage should be expected through the upper granular material following periods of prolonged rainfall. However, typically the standing groundwater level is expected to be at about RL 0.5m with fluctuations of +0.5m under normal (non-flood) conditions. # SOIL SURVEYS ENGINEERING eh, aan sy
Page 13
% Project 305-2325 February, 2006 . 7 we oe Page 7 6.0 ENGINEERING ASSESSMENT 6&1 Iraffickability and Site Preparation The fieldwork for this investigation which required site access along the beach was carried out using a track mounted Hydrapower drilling rig, therefore no problems were encountered over the loose sands on the site. A truck mounted drilling rig was utilised for the borehole located in the front eastern carpark. It is recommended that the exposed surface in the construction area be proof rolled to delineate loose areas and improve traffickability. The use of a sub-base gravel overlay (MRS 11.05, Subtype 2.3, B or C Grading/150mm nominal layer thickness) should also be considered in vehicle access areas to improve general traffickability during construction. Use of tracked equipment may be necessary for traffickability on the sand subgrade. The relevant contractors should therefore fully inform themselves of the ground conditions on site prior to commencement of earthworks. §.2 Earthworks It is understood that the proposed earthworks will consist of excavations to construct ground floor level at RL 2.0m. Earthwork procedures should be carried out in a responsible manner in accordance with AS.3798-1996 "Guidelines on Earthworks for Commercial and Residential Developments". 6.2.1 Subgrade Preparatio, Subgrade preparation procedures should include the following:- * Clearing, stripping and grubbing should be carried out in areas subject to earthworks. Also all soils containing organic matter should be stripped from the construction area; this material is not considered suitable for use as structural fill. * The subgrade should be proof rolled (where appropriate) under the supervision of Soil Surveys Engineering using a vehicle with a tare of at least 5.tonnes and then compacted to the required degree. # SOIL SURVEYS ENGINEERING
Page 14
a, Project 305-2325 . February, 2006 . Page 8 6.2.2 ‘ompacti ‘oc 1S ecifications While it is noted that significant filling is not anticipated, additional filling should be carried ‘out in accordance with AS.3798-1996, and the following should be noted: * The insitu soils, where free of organic and deleterious material, may be used for structural fill provided the moisture content of the soils on placement approximates the optimum moisture content required for compaction. This may require conditioning to bring the soils to optimum. + Any imported fill, if needed to make up earthwork deficiencies, should have a soaked CBR of not less than 10 percent and a maximum aggregate size of not greater than 75mm with not more than 20% greater than 20mm. Provided the placement moisture content of the imported fill or select insitu material approximates the optimum moisture content for compaction, suitable compaction should be achievable using a large static smooth drum roller. Guidelines for minimum relative compaction values for insitu soils and imported fill for the building and pavements are - presented in Table 3. Building Area 98i . 70 Notes:- i)% of the max. dry density determined by AS1289 5.1.1 (Std Compaction) 6.2.3 Excavation Characteristics It is anticipated that excavations will consist of the following:- * Bulk Cuts - for site stripping and excavation to construct basement levels. Excavations on site should be within the capabilities of light plant, small dozer (Cat D4C or similar) in bulk cuts and a medium sized backhoe (Case 580 or similar) or small excavator (12t - 15t) in trenching, based on the investigation findings. Should substantial excavations be required in these soils, larger plant could be budgeted to expedite workings. 7 : 2. 2 SOL SURVEYS ENGINEERING ..... eA
Page 15
a . e ' Project 305-2325 February, 20067 ~~ sate - wee - “Page 9 6.2.4 Batters The following general recommendations are made for short term stability of batters for bulk excavation of the site. * Batter angle not greater than 1V:2.5H from horizontal. * Top of batter to be a minimum of 2.0m inside any boundary line, in addition to 3.0 metres distance from any building or structure. * If batters are to be left untreated for any length of time, a batter angle of 1V:2.25H is recommended and berm width are to be strictly maintained. If seepage is encountered in the batters, slumping will occur. If seepage is not controlled, ‘slumping to angles half that described above (and flatter) is expected. Inspection of batters should be carried out by a geotechnical engineer from Soil Surveys Engineering, during bulk excavation works, to confirm the stability of temporary batters. ' 6.3 Building Foundations 6.3.1 Site Classification While a site classification in accordance with AS.2870 ‘Residential Slabs and Footings’ relates to residential type construction and is not directly applicable for this development, it is, however, a valuable method of classification. Given the investigation drilling encountered predominantly sandy soils only, which are non-reactive to variations in soil moisture, the site is classified as “Class A“ in , accordance with AS.2870.1-1996 ‘Residential Slabs and Footings’. While no surface : - movement would be expected due to changes in moisture, some settlements would be expected due to the underlying loose sand layers at depth. Settlement of less than 20mm (maximum) has been estimated for the encountered subsurface profile. Potential differential settlement would typically be in the order of 25% to 50% of the total settlement. This settlement would be expected to occur as elastic settlement as the construction loads are applied. It is recommended that the designers satisfy themselves that the use of AS.2870 is applicable for the proposed design. YF SOIL SURVEYS ENGINEERING
Page 16
Project 305-2325 February, 2006 ‘ Page 10 6.3.2 High Level Footings Shallow foundations do not meet the Noosa Shire Council's requirements for scour protection at this location. For temporary works such as the support of formwork etc., strip footings between columns maybe designed for an allowable bearing capacity of 75 kPa in the anticipated foundation soils (ie. Loose to medium dense sands). Loose sand, either as existing fill, backfill in overexcavated areas’ or natural, should be compacted to provide the required allowable bearing capacity. It is recommended that the bearing capacity of the founding soil be confirmed prior to construction. 6.3.3 Deep Foundations The choice of suitable deep foundation types should be made from non-vibration piling methods. Continuous flight auger (CFA) grout or concrete; or conventional bored piles may be suitable, although the construction of the latter may be problematic in loose sand, where collapse of the pile hole is likely. Other proprietary non vibration piling methods may also be suitable. : It is recommended that the deep foundations used on this project are designed in accordance with AS 2159-1995 Piling - Design and installation. This code uses the limit state design method. The design of a single pile or a pile group must be such that both the geotechnical strength R*, and the structural strength R*., are greater than or equal to the design action effect S*, ie. R‘,>S* and R*, > S* The design geotechnical strength (R*,) can be calculated as the ultimate geotechnical strength (Ru) multiplied by the geotechnical strength reduction factor @,. Based on the field test results, the following ultimate geotechnical strength (Ru,) parameters for the materials encountered on the site maybe used for preliminary design. - SOM SURVEYS-ENGINEERING ad.
Page 17
o Project 306-2325 1. NR - Not Recommended; NC - Not Considered in skin friction calculations. 2. Higher design parameters may be adopted depending on final pile type. Recommended geotechnical strength reduction factor (@,) = 0.45 to 0.55. 3. Considering limit state analysis (AS 2159-1995), the design geotechnical strength R*, is calculated by multiplying: the. ultimate geotechnical strength Ru by the geotechnical strength reduction factor @,, ie. R*y = Rug x By. 4. Should a "working stress" approach be adopted, a minimum factor of safety of 3.0 on base and 2.0 on skin friction is recommended. Based on the range of values provided in AS2159-1995 it is recommended that the geotechnical strength reduction value of 0.45 be adopted for the design of deep foundations on this site in conjunction with the ultimate strength values provided in Table 4. Depending on the load requirements, and the piling contractors design, it is recommended that the piles are founded in material which is at least dense, and at a minimum depth to meet the scour requirements. 6.3.4 Construction Considerations inspections It is recommended that inspections be undertaken by an experienced and qualified geotechnical engineer following footing excavations to confirm the adequacy of the founding soils. Inspections should be carried out prior to placement of reinforcing steel and ordering of concrete. Y SOIL SURVEYS ENGINEERING February; 2006——_____—+ Tre memes Paget? = TABLE 4 ULTIMATE GEOTECHNICAL STRENGTH PARAMETERS Sand - Loose — NR NR ~ Medium Dense 1000 20 Clay - Stiff to Very Stiff 675 30 - Very stiff to Hard 1350 45 Sandstone - Extremely Weak 1800 60 - Very Weak to Weak 2200 75 Notes: :
Page 18
Project 305-2325
February, 2006 ; Page 12
Underground Services
Where footings are located adjacent to existing structures, revetment walls etc. the
footings should extend to base a minimum of 200mm below the base level for a distance
of 1m out from the trench. Beyond 1m, the footings should be taken a minimum of
200mm below an imaginary line drawn up at 30 degrees from the base level. Figure 1
refers.
These requirements do not override minimum footing base levels.
Service
0 Trench
All footings 200mm
below this line 30°
1.0
‘ FIGURE 1
Pile Groups
Where higher column loads are involved, pile groups may need to be used to achieve the
required load bearing capacities.
Where pile groups are required, a pile spacing of not less than 2.5 times the pile diameter
is recommended. Larger pile spacing can be used if the efficiency of the pile groups
needs to be increased. Table 5 indicates the relationship between pile spacing and group
efficiency (after Tomlinson 1969).
TABLE 5 PILE GROUP EFFICIENCY
4%
2 x Pile Diameter 0.7
4 x Pile Diameter 0.8
2% SOIL SURVEYS ENGINEERING
Page 19
o° Project 305-2325 February, 2006 . 7 . — : ~ Page 13 ‘ucti id i Borehole BH2 was obstructed by boulders, thought to be part of an old seawall constructed in the past as a shoreline protection wall. Previous investigations carried out along Hastings Street encountered similar obstructions with boulders associated with the old seawall at depths of approximately RL 1.0m to RL 0.0m (top of obstruction). These obstructions are understood to have resulted in difficulties with the installation of steel sheet piles and have required removal of boulders for some piling operations. It would therefore be prudent to allow for the likelihood of boulders on this site in the form of removal of the boulders by excavator. | , Should any doubt arise as to the integrity or capacity of the installed piles being affected by obstructions, compliance testing of piles in the form of integrity testing and/or PDA testing should be considered. $4 Slab On Ground 6.4.1 General Field test results indicate that the existing natural soils, along with any controlled fill, are suitable for slab on ground construction provided that site preparation earthworks are carried out in accordance with recommendations in Sections 6.1 and 6.2. In addition, as noted in Section 6.3.1, the slab on ground floor should be designed to accommodate the anticipated potential ground surface movement. 6.4.2 Sub-Base It is suggested that a 150mm layer of sub-base be provided under all concrete slabs. The sub-base material should be compacted to a density not less than 95% of maximum dry density in accordance with AS.1289 5.2.1 (Modified compaction). The sub-base is provided under a concrete slab to:- * Provide a stable ‘working platform' on which to operate construction equipment; * Facilitate the provision of a uniform bearing surface under the slab. Sub-base material should be of good quality conforming to requirements (minimum) of Material Type 2.4 as specified in the Queensiand Department of Transport, Standard Specification MRS 11.05, Unbound Pavements (December, 1993). # SOIL SURVEYS ENGINEERING
Page 20
Project 305-2325 February, 2006 Page 14 6&5 Retaining Walls Retention systems should be designed in accordance with AS 4678-2002 ‘Earth- retaining structures’. : Basement walls should be designed using a pressure coefficient for the at rest case of Ko = 0.5. Unit wall force P is given by:- Pp = 0.5 Ko y H:? (kKN/m cun of wall) «where y = density of sand = 18kN/m? Ko = 0.5 Hy = height of wall (m) Until the base of the wall is prevented from inward movement by the strutting action of the first floor, the resistance of movement is provided by the friction of the soil beneath the base slab, and by the passive resistance of the soil against the vertical face of the toe of the wall. The intensity of passive resistance can be calculated from:- P = 0.5K, yH? where K, = 3.25 (ignores wall friction effects) He = front face of wall contributing to passive resistance (m) For the calculation of sliding resistance, the angle of friction for sand (¢) compacted to not less than 75% density index can be taken as 32° for walls with a key, For walls without a key, the angle of friction for sliding resistance may be taken as 2/3 ¢ or 21°. Note: The above expressions assume a horizontal plane ground surface and no surcharge. CONSTRUCTION INSPECTION It is recommended that groundfloor foundation and footing excavations be inspected by Soil Surveys Engineering Pty. Limited. or a duly qualified Geotechnical Engineer. Should subsurface conditions other than those described in this report be encountered, Soil Surveys Engineering Pty. Limited. should be consulted immediately and appropriate modifications developed and implemented if necessary. WB SOIL SURVEYS ENGINEERING
Page 21
Project 305-2325 ~~~" “February, 2006 ° ~~ ~ oo “Page 15 80 ACID SULFATE SOILS ASSESSMENT As shown in the summary table of quantitative ASS laboratory test results (Table 1), the Scr values are 0.00 - 0.01 %S which is well below the DNR’s defined acid sulfate soil “action level” of 0.03 %S, and this indicates there is only negligible levels of oxidisable sulphur, or potential acid sulfate soils (PASS). The measured total actual acidity (TAA) values are all 0 mol. H+/t, which indicates that the sand samples are not actual acid sulfate soils (AASS). It is concluded: from the observations made during the field investigation drilling and sampling, as well as from subsequent laboratory testing, that the amount of acid sulfate soil material present in the sand profile at this location, should be described as negligible to non-existent. Thus it is recommended that no treatment of soil material would be required for soil excavated from this location. Y SOIL SURVEYS ENGINEERING
Page 22
wy Project 305-2325 February, 2006 Page 16 9.0 LIMITATIONS We have prepared this report for the use of NOOSA SURF LIFE SAVING CLUB, for design purposes in accordance with generally accepted geotechnical engineering practices. No other warranty, expressed or implied, is made as to the professional advice included in this report. This report has not been prepared for use by parties other than NOOSA SURF LIFE SAVING CLUB or their associated consultants. It may not contain sufficient information for purposes of other parties or for other uses. There are always some natural variations in subsurface conditions across a site, which cannot be fully defined by investigation. The samples taken and used for laboratory testing are representative of site conditions. It is however unlikely that the measurements and values obtained from sampling and testing during the investigation will represent the Han, extremes of conditions that may exist within the site. Hence, it is recommended that if ground conditions encountered during construction significantly differ to those described in this report, further advice should be immediately sought from Soil Surveys Engineering. Soil Surveys Engineering offer a documentation review service to verify that the intent of geotechnical recommendations is properly reflected in the design. It is recommended that the client avail themself of this service; our standard rates will apply. S.L. GAMBLE (RPEQ 6644) B. W. EGEN SENIOR GEOTECHNICAL ENGINEER GEOTECHNICAL ENGINEER for and on behalf of SOIL SURVEYS ENGINEERING PTY LIMITED # SOIL SURVEYS ENGINEERING uF
Page 23
———— ~——_— Project 305-2325- - February, 2006 # SOM SURVEYS ENGINEERING
Page 24
Project 305-2325 February, 2006 # SOM SURVEYS ENGINEERING - -
Page 25
om i NOTES RELATING TO THIS REPORT INTRODUCTION These notes are provided by Soil Surveys Engineering Pty Limited (the Company) to complement the geotechnical report in regard to classification methods and field procedures. televant to all reports. Not all notes are necessarily The ground is a product of continuing natural and man-made processes and therefore exhibits a variety of characteristics and properties which vary from place Geotechnical engineering involves gathering and assimilating limited facts about these characteristics and properties in to place and can change with time. “™ order to understand or predict the behaviour of the ground on a particular site under certain. conditions. This report may contain such facts obtained by inspection, excavation, probing, sampling, testing or other means of investigation. If so, they are directly relevant only to the ground at the place where and at the time when the investigation was carried out. DESCRIPTION AND CLASSIFICATION METHODS Soils - The methods of description and classification of soils and rocks used in this report are based on Australian Standard 1726-1993 (Geotechnical Site Investigations), where appropriate. in general, descriptions cover the following properties - soil or rock type, colour, structure, strength or density, and | inclusions. Identification and classification of soil and ‘rock involves judgement and the Company infers - accuracy only to the extent that is common in current geotechnical practice. : Soil types are described according to the dominant particle size and behaviour as set out in AS 1726-1993. Cohesive soils are classified on the basis of strength. (consistency) either by use of hand penetrometer, shear vane, laboratory testing or engineering examination. The strength terms are defined in AS1726-1993 Table A4. Non-cohesive soils are classified on the basis of felative density usually based on insitu testing or engineering examination (see AS1726-1993 Table A5). Rocks - Rock types are classified by their geological names (AS1726-1993 Table A6), together with Table 1 Estimated strength descriptions given to rock based on engineering examination Very Weak 1.0-5.0 Weak 5.0-25 Medium Strong 25 - 50 Strong 50 - 100 Very Strong 100 - 250 Extremely Strong > 250 Ref ISRM "Suggested Methods for the Quantitative Description of Discontinuities in Rock Masses" descriptive terms regarding weathering (AS1726-1993 - Table A9), strength (refer Table 1 below), defects (AS1726-1993 Table A10), etc. Where strength testing (ie Point Loads) is carried out, AS1726-1993 Table A8 is used. Where relevant, further information regarding rock classification is attached. , SAMPLING . Sampling is carried out during drilling or from other excavations to allow engineering examination (and laboratory testing where required) of the soit or rock. Disturbed samples taken during drilling provide information on plasticity, grain size, colour, moisture content, minor constituents and, depending upon sample disturbance, (information on strength and structure). Undisturbed samples are taken by pushing a thin walled sample tube, usually 50mm diameter (U50), into the soil and withdrawing it with a sample of the soil contained in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear volume change potential Undisturbed sampling is generally effective only in cohesive soils. strength, and compressibility. Details of the type and method of sampling used are given on the attached logs. NOTEREP.SAM SOIL SURVEYS ENGINEERING
Page 26
-2-
INVESTIGATION METHODS
The following is a brief summary of investigation
methods currently adopted by the Company and some
comments on their use and application.
Test Pits - These are normally excavated with a
backhoe or a tracked excavator, allowing close
examination of the insitu soils if it is safe to descend
into the pit. The depth of penetration is limited to about
3m for a backhoe and up to 6m for an excavator.
Limitations of test pits are the problems associated
with disturbance and difficulty of reinstatement and the
consequent effects on close-by structures. Care must
be taken if construction is to be carried out near test pit
locations to either properly recompact the backfill
during construction or to design and construct the
structure so as not to be adversely affected by poorly :
compacted backfill at the test pit location.
Hand Auger Drilling - A borehole of 50 to 100mm
diameter is advanced by manually operated
equipment. Refusal of the augers can occur on a
variety of materials such as hard clay, gravel or rock
fragments and does not necessarily indicate rock level.
Continuous Spiral Flight Augers - The borehole is
.advanced using 75 to 300 mm diameter continuous
Spiral flight augers, which are withdrawn at intervals to
allow sampling or insitu testing. This is a relatively
economical means of drilling in clays and in sands
above the water table. Samples are retumed to the
surface by the flights or may be collected after
withdrawal of the augers. Information from the drilling
{as distinct from specific sampling) is of relatively lower
reliability due to remoulding, inclusion of cuttings from
above or softening of samples by groundwater, or
uncertainties as to the original depth of the samples.
Augering below the groundwater table has a lower
reliability than augering above the water table. Various
drill bits are attached to the base of the augers during
the drilling. The depth of refusal of the different bit
types can provide information as to the strength of the
material encountered. Generally two different bit types
are used. The 'V' bit is a V shaped steel bit and the
‘TC’ bit is a tungsten carbide tipped screw type bit.
Wash Boring - The borehole is usually advanced by a
rotary bit with water or fluid pumped down the hollow
drill rods and returned up in the space between the
NOTEREP.SAM
rods. and the soil or casing, carrying the drill cuttings.
Only major changes in stratification can be determined
from the cuttings, together with some information from
and
information on soil strata is gained by regular testing
and sampling using the Standard Penetration Test
(SPT) and undisturbed thin walied tube samples (U50).
Mud_ Stabilized Drilling - Either Wash Boring or
Continuous Core Drilling can use drilling mud as a
circulating fluid to stabilize the borehole.
“feel” rate of penetration. More accurate
The term
"mud" encompasses a range of products ranging from
bentonite to polymers such as Revert or Biogel. The
mud tends to mask the cuttings and
identification is only possible from regutar intact
sampling (eg. from SPT and U50 samples) or from
tock coring, etc.
Continuous Core Drilling - A continuous core sample
is obtained using a diamond or tungsten carbide
tipped core barrel.
reliable
Provided full core recovery is
achieved (which is not always possible in very weak
tocks and granular soils), this technique provides a
very reliable method of investigation. In rocks, NMLC
coring (nominal 52 mm diameter) is usually used with
water flush. The length of core recovered is compared
fo the length drilled and any length not recovered is
shown as CORE LOSS. The location of losses is
determined on site by the supervisor. If the location of
the loss is uncertain, it is placed at the top end of the
tun, when the core is placed in a storage tray and
recorded on the log.
Standard Penetration Tests - Standard Penetration
Tests (SPT) are used mainly in non-cohesive soils, but
can also be used in cohesive soils, as a means of
indicating density or strength. The test procedure is
described in Australian Standard 1289, “Methods of
Testing Soils for Engineering Purposes" - Test 6.3.1.
The test is carried out in a borehole by driving a 50mm
diameter split sample tube with a tapered shoe, under
the impact of a 63 kg hammer with a free fall of 760
mm. It is normal for the tube to be driven in three
successive 150 mm increments and the 'N’ value is
taken as the number of blows for the last 300 mm, the
upper 150 mm being neglected due to possible
disturbance from the drilling method. In dense sands,
very hard clays or weak rock, the full 450 mm
SOIL SURVEYS ENGINEERING ,
gil
oy
“i
Page 27
nn Be penetration may not be practicable and the test is discontinued at a reduced penetration. In the case where full penetration is obtained with successive blow counts for each 150 mm of, say 4, 6 and 7 blows, the record shows, 4,6,7 N=13 In a case where the test is discontinued short of full penetration, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm, the record shows: 15, 30/40mm The results of the test can be related empirically to the engineering properties of the soil. Occasionally, the drop hammer .is used to drive 50mm diameter thin walled sample tubes (U50) in clays. In such circumstances, it is noted on the borehole logs. A Modification to the SPT test is where the same driving system is used with a solid 60° tipped steel cone of the same diameter as the SPT hollow sampler. The solid cone can be continuously driven for some distance in soft clays or loose sands, or may be used where damage would otherwise occur to the SPT. The results of this Solid SPT are shown as "N<" on the borehole logs, together with the number of blows per 150 mm penetration. Cone. Penetration Tests - Test Method - Cone Penetration Tests (CPT) are carried out in accordance with AS 1289 Test 6.5.1-1977, using an electrical friction-cone penetrometer. The test essentially comprises the measurement of resistance to penetration of a cone of 35.7 mm diameter pushed into the soil at a rate of'10-20 mm per second by hydraulic force. The resistance to penetration is recorded in terms of pressure on the end area of the cone (cone resistance, qe, in MPa) and friction on the side of the 135 mm tong sleeve immediately above the top of the cone (friction resistance, fs, in kPa). These forces are measured by electrical transducers (strain gauges) within the cone device. The ratio between friction resistance and cone resistance is also calculated as a percentage, ie.- Friction Ratio (FR) = FHstoa Resistance. (kPa) x 100 SE The friction ratio, FR, is generally low in sands (less than 1% or 2%) and generally higher in clays (say 3% or more). The interpretation of sandy clays, clayey sands and material with a high silt content is more difficult, but intermediate values (between 1% and 3%) would be expected. Highly organic clays and peats generally have a friction ratio in excess of 5%. Static cone data is recorded in the field on disc for later presentation using computer aided drafting. The equipment can be operated from any conventional drill rig. A total applied load in the range of 4 to 10 tonnes is required for practical purposes, although lighter loads may be used. The cone penetrometers are available with various capacities of cone resistance ranging up to 100 MPa for genera! purpose investigations, while a range of 0 to 10 MPa can be used where more sensitive investigations of soft clay are required. The cone resistance value provides a continuous measure of soil strength or density, and together with the friction ratio, provide very useful indications of the presence of narrow bands of geotechnically significant layers such as thin, soft clay layers or lenses of sand which might otherwise be missed using conventional drilling methods. The lithology of the encountered soils is interpreted from static cone data and is generally presented on the Static cone log sheets. It is important to note that the lithology is interpreted information and is based on research by Schmertmann. (1970), Sanglerat (1972), Robinson and Campinaili (1986), modified to suit local conditions as indicated by borehole information and laboratory testing. As soils generally change gradually it is sometimes difficult to accurately describe dépths of strata changes, although greater accuracy is obtained with the static cone compared with conventional drilling. In addition, friction ratios decrease in accuracy with low cone resistance values, and in desiccated soils. As a result, some overlap and ‘minor discrepancies may exist between static cone and nearby borehole information. Portable Dynamic Cone Penetrometers - Portable Dynamic Cone Penetrometer (DCP) tests are carried out by driving a rod into the ground with a falling weight hammer and measuring the blows for successive 100mm increments of penetration. NOTEREP.SAM SOIL SURVEYS ENGINEERING
Page 28
-4- The DCP comprises a Cone of 20 mm diameter with 30 degree taper attached to stee! rods of smaller section. The cone end is driven with a 9 kg hammer falling 510 mm (AS. 1289 Test 6.3.2). The test was developed initially for pavement subgrade investigations, and empirical correlations of the test results with California Bearing Ratio have been published by various Road Authorities. The Company has developed their own correlations with Standard Penetration tests and Density Index tests in sands. LOGS The borehole or tést pit logs presented herein are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on the frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling. or core drilling will enable the most reliable assessment but is not always practicable or.possible to justify on economic grounds. In any case, the boreholes or test pits represent only a very small sample of the total subsurface conditions. The attached explanatory notes define the terms and symbols used in preparation of the logs. Interpretation of the information shown on the logs, and its application to design and construction, should therefore take into account the spacing of boreholes or test pits, the method of drilling or excavation, the frequency of sampling and testing and the possibility of other than "straight line" variations between the boreholes or test pits. Subsurface conditions between boreholes or test pits may vary significantly from conditions encountered at the borehole or test pit locations. GROUNDWATER Where groundwater levels are measured in boreholes, there are several potential problems. “Although groundwater may be present in lower permeability soi!s, it may enter the hole slowly or perhaps not at all during the time the hole is open. *A localized perched water table may lead to an erroneous indication of the true water table. «Water table levels will vary from time to time with seasons or recent weather changes and may not be the same at the time of construction. NOTEREP.SAM «The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be bailed out of the bore and mud must be washed out of the hole or “reverted” if water observations are to be made. More reliable measurements can be made by use of standpipes which are read after stabilizing at periods tanging from several days to perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from perched water tables or surface water. FILE . The presence of fill materials can often be determined only by the inclusion of foreign objects (eg. bricks, Steel, etc.) or by distinctly unusual colour, texture or fabric. Identification of the extent of fill materials will also depend on investigation methods and frequency. Where natural soils.similar to those at the site are used for fill, it may be difficult with limited testing and sampling to reliably determine the extent of the fill. The presence of fill materials is usually regarded with caution as the possible variation in density, strength and material type is much greater than with natural soil deposits. Consequently, there is an increased risk of adverse engineering characteristics or behaviour. If the volume and quality of fill is important to a project, then frequent test pit excavations are preferable to boreholes. ABORA Laboratory testing is normally carried out in accordance with Australian Standard 1289 "Methods of Testing Soil for Engineering Purposes”. Details of the test procedure used are given on the individual report forms and the attached explanatory notes summarize important aspects of the Laboratory Test Procedures adopted. , ENGINEERING REPORTS reports are prepared by qualified personnel and are based on the information obtained Engineering and on current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal the information and interpretation may not be relevant if the design proposal is changed. If this happens, the Company will SOIL SURVEYS ENGINEERING
Page 29
we ee ne 5. be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and aspects fecommendations or suggestions for design and construction. Since the test sites in any exploration represent a very small proportion of the total site and since the exploration only identifies actual ground conditions at the test sites, even under the best circumstances actual conditions may vary from those inferred to exist. No responsibility is taken for:- *Unexpected variations if ground and/or groundwater conditions. «Changes in policy or interpretation of policy by Statutory authorities. * The actions of other persons, . *Any work where the company is not given the opportunity to supervise the construction using the _ Companies designs/recommendations. ; if differences occur, the Company will be pleased to assist with investigation or advice to resolve any problems occurring. SITE ANOMALIES in the event that conditions encountered on site during construction appear to vary from those expected from the information contained in the report, the Company requests that it immediately be notified. Most problems are more readily resolved when conditions are exposed than at some later stage, well after the event. REPRODUCTION OF INFORMATION FOR Cc uy SES Attention is drawn to the document "Guidelines for the Provision of Geotechnical Information in Tender Documents", published by the Institution of Engineers, Australia. Where information obtained from this investigation is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. in circumstances, where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. The Company would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. REVIEW OF DESIGN — Where major civil or structural developments are proposed of where only a limited investigation has been completed or where the geotechnical conditions/ constraints are quite complex, it is prudent to have a joint design geotechnical engineer. We would be happy to assist in review which involves a_ senior this regard as an extension of our investigation commission. SITE INSPECTION . The Company will always be pleased to provide engineering inspection. services for aspects of work to which this report is related. geotechnical i) Site visits during construction to confirm reported ground conditions _ ii) Site visits to assist the contractor or other site personnel in identifying various soil/rock types such as appropriate footing or pier founding depths, the stability of a filled or excavated slope; or ii) Full-time engineering presence on site. In the vast majority of cases it is advantageous to the principal for the geotechnical engineer who wrote the investigation report to be involved in the construction stage of the project. NOTEREP.SAM SOIL SURVEYS ENGINEERING
Page 30
Soil Surveys Engineering Pty. Limited LEGEND SHEET
septese vachnical engineers RPEOQ No. 165
ACN. 054.043 635
bredaneCsoltsuveye
Information Graphic Legend
DRILLING TYPES
V - open hole driliing using augers and a sise! “V* bit
TC - open hole drilling using augers and a Tungsten Carbide bit
WB - wash boring using a drag or blade bit CH- CLAY of high plasticity
RR - wash boring using a rock roller bil
Casing Revi ect abng core barrel Cl- CLAY of intermediate plasticity
DEPTH ; .
Expressed in metres balow the surface unless otherwise noted CL - CLAY of low plasticity
ROCK DESCRIPTION MH - SILT of high plasticity
Rock name, grain size, colour, texture, fabric and any other relevent comments.
WEATHERING GRADES MI- SILT of intermediate plasticity
XW - Extremely Weathered :
DW - Distinctly Weathered ML - SILT of low plasticity
SW - Slightly Weathered
FR- Fresh
STRENGTH
{estimate of UCS) OH - Organic SILTS and CLAYS of high
VW - very weak 0.7 t 2A MPa plasticity
He nak 2 4 7.0 7 1024 MPa OL - Organi SULTS and CLAYS of low
S - strong 24 to 70 MPa SRO Plasticity
VS - very strong 70 to 240 MPa SAX SC -Clayey SAND
CORING DETAILS PrP 7 .
Rec - core recovery in each run expressed as a % / SM - Silty SAND
RQD - Rock Quality Description expressed as a % 5 .
Defect Description
3.00m;J45;p,s,0,z
Depth in matres; Defect Type and angle with the core axis;planarity, roughness aperture, Infili .
Defect Type Planarity Roughness Aperture GM - Silty GRAVEL
J+ Joint p- Planar 8-Smooth o-
F - Fotiation 8- Sub-planar r- Rough ¢- Closed GP - poorly graded GRAVEL
¢-Curvtlinear v- Very Rough
i u-Undulating | - Slickensides Calcite
S - Shear Zone "9 v GW ~well graded GRAVEL
P- PEAT
SP - poorly graded SAND
SW - Well graded SAND
GC - Clayey GRAVEL
T
c- . Fill
Zz-
RJ- Relict Joint
Testing
SPT
U50 Tube Resove
Poot penetrate aay ™
Vane Shear Testing
‘Seating, peak and residual : Corrected value
Oistrbed Samples
Water Intersections
—_ ‘Water steady level
Granite
aor ‘Water first noted
Basalt
Testing Results . Taf VOLCANIC ASH
pore Point Load Test Result
~~ 1s50=4 (A) A- Axial. - Dlamatral VOLCANIC AGGOLMERATE
MARINE DEPOSITS
ISSUE No. 1.1 08/10/97 RSO05
Page 31
. or a Project 305-2325 February, 2006 # SOIL SURVEYS ENGINEERING
Page 32
XEN. O84 043 631
‘eral [email protected] au
Borehole Number: 1
” Soil Surveys Engineering Pty. Limited BOREHOLE RECORD SHEET
Gactuchrical ayginaere RPECO No. 195
rl 2sa och Breet Unt 039 Cawtance Dr 11 Produion Ave
Revo, See, Sele. ;
meee, | ENA aaa Project Number: 305-2325
Project Name : Surf Club Extension
Easting: Nothing : RL: Location : Hasting St., Noosa Heads
Logger: Drier: Diling Rig: Client : Noosa Surf Club
Date : 21/12/2005 Page : 1
Drilling Method g Sam
ag ples and
>elelele Oepth & Description Remarks
i ‘| SAND (SP) Loose, fine to medium grained, light grey white, moist. Dp q
0.40 Zz J
— SAND (SP) Loose, fine to medium grained, light grey and light brown, moist. mp ~j
E 1.0 the rm D. 4
_— j D _
5 SPT 4
E Nifo q
= - Dd —|
- - op 4
r 20 D q
+— mop J
- an q
E —
¥ D 4
F | a5 7
- 30 cy —
- 3.70 q
- 4 0 ‘| SAND (SP) Loose, fine to medium grained, grey, moist. 7
rw 40 pa 7
- SAND (SP) Loose, fine to medium grained, light grey white, wet. ser Fg
i 4,50 4 | | ie 4
- -| SAND (SP) Loose to medium dense, fine to medium grained, dark brown, moist. “ q
p60 _
ct | SPT 4
— 247 —
- Nell 4
F 6.0 , 4
E 0 Je
= 7.60 7
- SAND (SP) Medium dense, fine to medium grained, grey brown, moist. q
- 8.0 —S
- SPT =
; 611,16 —
I Nei? a
sy 9.10 ~T7
- SAND (SP) Medium dense, medium to coarse grained, blue grey, trace of fine 7
— size gravel, moist. q
F 10.0 1 spr q
[COMMENTS
1) Groundwater noted at 4.1m.
‘w Water First Noted “7 Water Steady Level
Approved SIG
Date: _168/2/08
{88UE No. 1.1 0810/97 RSOOTA
Page 33
Soil Surveys Engineering Pty. Limited
~ BOREHOLE RECORD SHEET
RRR Gig ae owe _ RPE N48 — = a mn —
Level 210 Cece Breet UR ose Lmearce Dy 11 Prtction tee Borehole Number: 1
Pecan a sos Kerang Suasts bette 2 A573 :
Pasa ea. | RE Project Number: 305-2325
Project Name : Surf Club Extension
Easting: ‘Northing : RL: Location : Hasting St., Noosa Heads
Logger : Diiller : Drilling Rig : Client : Noosa Surf Club
Date : 21/12/2005 Page : 2
Drilling Method g
inti Samples and
(| 910 [3A Depth é Description Remarks
a _J 67.10
C SAND (SP) Loose, fine to medium grained, lorange brown, moist. Nel7
E NY Sandy CLAY (CH) Stiff, high plasticity, red mottled grey, coarse grained
11.0 \ sand, fine size gravel.
— \ | SPT
— , 45.7
rc \ Nel2
F 12.0 \
- 13.0 \ ] ser
+__ 6,10
C 13.20 \ Naié
- \ Silty CLAY (CH) Stiff, high plasticity, orange brown mottled grey.
E 13.80 \
14.0 NY Silty CLAY (CH) Stiff, high plasticity, grey streaked orange brown. ‘
F | srr
+— 24,7
- Nei)
F 15.0
Ewe |g
( ) C
F 17.0
FE 17.45 : SPT
— SANDSTONE (XW) / Sandy CLAY (CH) Extremely to very weak, light grey, wit} Nel6
= bands of high plasticity fines.
18.0
p
F 190 le
c Nails
F200 _
COMMENTS
4 1) Groundwater noted at 4.1m.
— LL _____
Approved
Date :
ISSUE No. 1.1 0810/97 ‘RSOO7B
Page 34
Consutin ACN, 084 043 631 eran brian, 7E.cOM.BL Level 2 49 Finchisy Bveet Unit 9 30 Lawrence Or ion @ 4084 Naren 0.4211 PO Bex 317, PO Box 2011 4084 Nerang 0.4214 Ph 61. $389 6000. Phot? 6596 1 Faxes 7 3980 6080 Paxev 78570 3018 Borehole Number: 1 Project Number : Project Name : Surf Club Extension 11 Production Ave Waters @ 4578 Gucdina © 4578 Pn 817 5405 1733 Fax 61 7 6493 2337 Soil Surveys Engineering Pty. Limited BOREHOLE RECORD SHEET Geotechnical engineers — RPECG Wo. 195 305-2325 ee ISSUE No. 1.1 O8/10/87-RSO07C ~ — Easting Northing : RL: Location : Hasting St., Noosa Heads Logger Diller: Driling Rig : Client : Noosa Surf Club Date : 21/12/2005 - Page : 3 Drilling Method , £ a Samples and Plelelele 7 Depth E Description Remarks = 20.20 = E Borehole 20.20m Fim 3 — Terminated Tq F 21.0 4 F 22.0 J F 23.0 = F 240 4 FE 4 C 4 F 25.0 = 26.0 = F 27.0 = 28.0 _ 280 4 F 30.0 4 COMMENTS. }) Groundwater noted at 4.1m. Approved SEG Date: 4ARi2iMR
Page 35
e ‘a a wt TY y Soil Surveys Engineering Pty. Limited. BOREHOLE RECORD SHEET ‘Gonautting Gectect engineers RPECO No. 195 ‘ne com. _ MS pera aeecie oe Unite ab Lawrence Ov 11 Production Ave Borehole Number: 2 : ean 24008 feerang e211 Bosna 2 4370 . Foch y'sse0 sa00 a estat | ROEM SY Project Number : 305-2325 Project Name : Surf Club Extension Easting: Northing RL: Location : Hasting St., Noosa Heads Logger : Driller Drilling Rig : Client : Noosa Surf Club Date : 22/12/2005 Page : 1 Drilling Method 2 he & sg Samples and Cc elslela 7 Depth & Description Remarks C ‘| SAND (SP) Loose, fine to medium grained, light brown and white. 7 C 4 q = J oy a) . 4 , F_20 - 2.20 q ae - 2.25 loulders. oe A — Borehole 2.25m z F Terminated 4 p30 an P40 a F_§0 = P60 4 r) - q E70 4 my) ' - q P_9.0 = EF _10.0 J COMMENTS Approved .SLG_ Date: § 46/2/06 L ‘w Water First Noted ~7 Water Steady Level ISSUE No. 4,1 68/10/57 RSOOTA
Page 36
LU ~W Water First Noted ~~ Water Steady Level Approved :SLG Date: 46/2/M6 iSSUE No. 1:1 OBMO/87 RSOOTA a ene ra = Soil Surveys Engineering Pty. Limited BOREHOLE.RECORD SHEET Sopesting Sastaceen teen cai enginemrs = RPECOQ No. 106 ‘rail [email protected] Loyal? 1einchiy Guest — Unite SELewrance Dr 11 Progucton Ave Borehole Number : 3 Reo ete, ethen ; Fuster 7 a060 8660 Emeat, ROTA, Project Number : 305-2325 Project Name : Surf Club Extension : ion : i . leads Easting : Northing : RL: Location : Hasting St., Noosa Hi ian Bi ient : Noosa Surf Cl Logger: JM Driller: JM Drilling Rig: GemcoHP7 Client rarf Club Date : 07/02/2006 Page : 1 Drilling Method 2 & ag Samples and >elelele t Depth E Description Remarks a 0,10 Bitumen. ~ [— 0.25 Clayey SAND (sc) Medium dense, fine to coarse grained, brown, medium q = 0.50 “Wolasticity fines, moist 7 — ~ SAND (SP) Medium dense fine ta medium grained dark grey moist, a - | SAND (SP) Medium dense, fine to medium grained, grey, moist. 7 P10 1.00 : - Ss - ‘| SAND (SP) Medium dense, fine to medium grained, light grey, moist. q - ] SPT q - 59.9 q P_ 2.0 2.00 Ne i" Me Silty SAND (SM) Medium dense, fine to medium grained, dark brown, low 4 ~ 2.25 plasticity fines q — Silty SAND (SM) Medium dense, fine to medium grained, dark brown, low 4 _ plasticity fines, wet. "x F 30 4 i ] SPT o - Of, 34,8 4 a of Nelz a F 40 GY J = | sPT q s 7,10,12 4 50 Nel 3 | = 5.50 . 4 - 5.75". SAND (SP) Medium dense, fine to coarse grained, brown, trace of fine size a i . eI 4 - 6.0 SAND (SP) Medium dense, fine to medium grained, grey. 3 E | SPT q — 12,18,20 q _— . Nwas 7 = Sandy GRAVEL (GC) Very dense, fine to medium size, grey and light grey, D qj - fine to coarse grained sand. q p70 SAND (SP) Medium dense, fine to medium grained, light grey. SS _ | SPT q a 32,12,14 4 - 80 N=26 4 go 4 a | SPT q - 15,1911 a - 9.50 [22 SAND (SP) Medium dense, fine to medium grained, yellow brown mottled grey. N=30 a - Sandy CLAY (CH) Hard, high plasticity, grey mottled grey brown, fine to 4 medium grained sand. qa | E 10.0 NS . 7 COMMENTS 1) Groundwater not observed.
Page 37
Aa ak Fux 61 7 3380 6060 Soil Surveys Engineering Ply. Limited BOREHOLE RECORD SHEET ere Gereitog Gevaert eign REECO No. 195 ‘email [email protected] 3 wel La : Huelzso chi Breet Une sa umrance ryt Progusen ve Borehole Number : Pescigen0 4008 rng 3211 Boxer 0 4575 Pret 73989 e000 Pros? 6499 1753 Project Number : Project Name : Surf Club Extension - Pret? 8805 1528 Fox 8t 7 5578 3910 305-2325 1) Groundwater not observed, Easting: Northing : RL: Location : Hasting St., Noosa Heads Logger: JM Driller; JM Drilling Rig: GemcoHP7 Client : Noosa Surf Club Date: 07/02/2006 Page : 2 Drilling Method 2 : th 2 a Samples and > ele |els Depth § Description Remarks \ C 10.70 N | q iE Gravelly CLAY (CH) Hard, high plasticity, jotted grey brown, fi 3 rr 1t.0 11.00 WN size ye aah fee ta Ee eae arey ne — - SANDSTONE (XW) / Sandy CLAY (CH) Extremely to very weak, light grey, with 4 - bands of high plasticity fines. a F 120 4 ~~ Tz S ] SPT 4 Ss 4,812 - - N=20 4 F 13.0 = C | Ser q F 14.0 Nesp 4 - :] SANDSTONE (XW) Very weak, light grey. q a F 15.0 J C 15.00 Borehole 15.00m SPT J - Terminated 4121 4 F 16.0 3 E ; C 7 F 17.0 = | F J F 18.0 F 90 3 F 20.0 7 COMMENTS Approved: SIG Date : -AB/2/08 ISSUE No. 1.1 08/1097 RS007B
Page 38
tyes ma i - Project 305-2326 February, 2006 X -- @ SOIL SURVEYS ENGINEERING ~~ =~
Page 39
Record of Borehole Consuttiny Gooteckolesterigisc Quemaiand 4064 roeeny Client A. TOO AND PARTNERS (NC) PTY. LTO. Miser fou Pine Road Stratteine. Queerstend 4500 vr, NOOSA HEADS. SOlSurveys: ema Location Bentrine Brock, Ceeerctang 4575 o7193t733 ber 84M/1175 gre ar ocwome soeet on 4TH SEPTEMBER, 1984 Page 1 of 2 one Borehole number 1 | surface Rt Sampling and field testing Deptnot | crassitcation Be | Depinim | type | retaeen change tm) | Australian Standara 1726-1981 . used . resurs 0.00) SAND (SP) _ |v Loose, fine to medium grained, . light grey and light brown, moist. 3.00-3.45| SPT | 3,4,6 : N=10 » 4,60 SAND (SW) Loose, fine to coarse grained, dark brown, moist. 5.00 SAND_(SW) ased AS above at 4.60m but wet. Wash 6.00-6.45| sPT | 34,6 ore N=10 7.20 SAND Loose, well graded, light 7.50-7.95| SPT | 3,4,7 grey, large amount of seashells, N=7} wet. 9.20 SAND_(SW) As above at 7.20m but some fine to medium sized gravel. 9.70 Sandy CLAY (CH) Stiff, medium to high plasticity, light grey, well graded sand, ( some fine to medium sized grave moist. 10.50 Sandy CLAY (CH) : 10.50-10.95 SPT | 13,8,13 As above at 9.70m but some N=21 coarse sized gravel in loose to medium dense layers (100-200mm thick). . 11.00 SAND (SW) Well graded, loose to medium dense, grey with yellow brown layers, wet. ~--/Cont. ‘Waer Drilitype JACRO 350 nored = § 00m Seeacty Dritter 3. MANNS level ‘Vane shes valve, kPa [2 Undtsurbed Soown dem. nie senpte heave or me Non iien bee renown oon Bren 9.0 7a harrrar, toll Otro, driving 30 oecrwe taper cone Man eta ang Crop toner torte Meee bow coxa nowhT Jethe mermet of Cone tem, . Race at roc Bnamer eo 500mm. P| Mand penetrometer eximate of aptae screngch, KPa
Page 40
Record of Borehole Consulting Geotactonnal Engr ing hla 07369 e000 POR 317 4088 Ctient A. TOD AND PARTNERS (NC) PTY. LTD. Pre Soother. Goceratend 4500 Project NOOSA SURF CLUB Soll Surveys CTR Me mus Location NOOSA HEADS Pott a on 93 173) 84M/1175 Lina 4/3 Thorsborne Sereet be: 2 cae ~—sATH SEPTEMBER, 1984 Page 1 of 2 own Borehole number 1 Cont. | surtacer Sampling and field testing Depth of Classification Bit Depth tm) Type Fietd test Ehange(m) | Australian Seandard 4726-1981 vedt resus 11.8 Silty Sandy CLAY (CH) Hard, medium to high plasticity, 12.00-12.30 SPT] 12,23/150m red brown and light grey, fine N>46 to medium grained sand, some fine sized gravel. 12.79 Sandy S$ Y / Stiff, medium plasticity, ligtit 15.00-15.45 SPT| 5,7,9 grey and yellow brown, fine grained N=i6: sand, moist. 18.00-18.90 USO] pags 21.18 ndy Silt Y 21.00-21.45 SPT; 9,15,22 As above at 12.70m but stronger, N=37 tending to Siltstone (extremely weathered). 21.49 BOREHOLE TERMINATED. Orititype JACRO 350 neced 5 .00m Steady peter 3. MANNS eels p> uaeeutes Ston ctam soe meres scomm ¥ vee . “ Gruagemmenngemstomtermcneent inewnmort BE SERRE mare prtten enro mann teere P Band penetrometer eximate of shear srengch, &Pa ae : tp
Page 41
Record of Borehole Soil Surveys and Exploration Pty Lto eys and Expl " y Consulting 12 Meewesier Torracs Matron, Queenatand, 4084 Engineers Unit 1, 27 Lawrence Drive, Nereng, Quescateed, 4211 “phone: (07) 388 6000. #0. Boa 22 fox: 157) 208 4680 Ashmore City Cid 4214 CHlent The Tod Group (8C) Pty Ltd 0, Bon 37 na, aonn eam (O7R1 96 1308 Unh 3, 1? Duetroon Street Uni 1, Let 10 Larniernay Sree Project Proposed Extensions SoliSurveys sie cone oo i ee , tocstion = Noosa Surf Life Saving Club meme om 11 Production Avenue Kewera Weters, Queensiand, 457+ dobnumper 90K/324 Ciercnemyaore, Qusendand, 455) Date 21/12/90 Fao tonsa east Borehole number BH2 Surface RL Sampling and feld testing Depth of Classification Bit Depth (m) type Field test Saye tm} Australian Standard 1726-1981 used resutts 0.00]. SAND (SP) loose, fine to medium <..|V we grained, light grey, dry. 1.00] SAND (SP) loose, fine grained, grey, dry. -60-1.95/SPT | 4,5,7 N=12 1.60)" loose to medium dense, fine to medium grained, light brown grey, moist. 2.30] SAND (SP) loose to medium dense, fine to medium grained, dark brown, moist. 2.60| As above, wet. $.00-3.45|SPT 614.5 N= 4.00! Continuous drilling with mud circulation. 4.10] SAND (SP) loose, fine to coarse grained, brown. 4.50-4.95/SPT |3,3,3 N=6 5.40] As above, grey. $.00-6.465/SPT | 3,4,4 6.80} Gravelly SAND (SP) medium dense, N=8 fine to coarse grained, tight brown and grey, fine to coarse sized gravel, wet. 7.20) As above, fine to medium sized gravel. -50-7.95/SPT | 11,10,8 N=18 7.80) SAND (SP) medium dense, fine to medium grained, light brown. (Continued) Drititype Jacro 350 Water 2.60m Driller J. Manns. and B. Champ. steady - UW 50 Undisturbed Somm diam, tube sampie 0 Disturbed Sample SPT Standard Penetration Test. N Vatue is number of blows to drive SOmm sampler 300mm with a 63.4k9 drop haremer failing 76zmm. Blow caunt shown} Jisthe number of blows required to drive 50 300mm. P and pevetromete: estimate of shear strength, kPa S$ Vane shear value, kPa V_ Steel V Bt i Tungsten Carbide Bit OC Oyram Cone Test. 9.09%g hammer, fall SGBmm, driving SP dnreetaper cone fied to rods of smatter section.
Page 42
Rate
tou os:
i x,
og v
Record of Borehole - Sonauhany Geotecincal engineers
Moon Severn Novag, Oueerennds S20
Ror GSES AE oe ae
Client The Tod Group (SC) Pty Ltd ce. tums, ace Fant” fel bs sone
. Unit 3, 17 Duntroon Bt: unit, Lorne Lschterney per!
Project Proposed Extensions SoilSu Potente foe laa toes
Location Noosa Surf Life Saving Club Drona: 107 08 sass Fen: Riloar
™ Kovara Warr, Gusenind, 457
dobnumber =90K/324 Ratenciny ee, Cuwensiand, 4551
Date 21/12/90 Fen” ont ba dea?
Borehole number BH2 (Cont'd Surtace re Sampting and fieid resting
Bepth at Classification Bh Depth im) Type | Fleldeest
change|m) | — Austratian Standard 1726-1981 used results
8.30} SAND (SP) medium-dense, fine to Vv “How,
medium grained, grey. 9.00-9.45 |SPT oedee tT
=.
10.05 Silty Sandy CLAY (CH) very stiff,
high plasticity, light grey and 0.580 SPT |5,7,8
blewish grey, fine to medium N=15 : Y
grained sand,
11.66 As above with yellow brown and
red brown layers. 2.00 SPT |8,8,12
N=20 |
12.45 Borehole Discontinued
i ‘Water
Orilltype Jacro 350 need 2.60m
Dritier J. Manns, and B. Champ. seaty =
USO Undisturbed Somm diam. tube sample ‘Vane shear value, KPa
D_ Disturbed Sampte V_ Steeiv Bit
SPT Standard Penetration Test, N Valve is number of blows ta drive 50mm sampler 300mm TC Tungsten Carbide Bit
with a 63.6k9 crop hatrmer falling 762mm. Blow count shown { Jis the number ot oc Symamic Cone Test. 9.079 hammer, fail SOBmm, driving 30 degree taper cone
blows required to drive U50 300mm. ) fitted to rods of smaller section.
P Hand penetrometer estimate of sheay strength, kPa
Page 43
* “aM Project 305-2325 February, 2006 # SOIL SURVEYS ENGINEERING
Page 44
vee ‘
° te 7
Soil & Water Laboratories P/L
10 Finchiey St Mitton, Queenland 4064.
Phone: (07) 3369
6668; Fax (07) 3503
9063
Screening Test
For Sol Surveys Engineering Pty Lid, 11 Production Avenue, Kawana Waters Qid. 4575, RECREDITANION ‘
Ref. Number. 14 - 2325
This Document fs issued in
Project Number: 30S - 2325 accordance «=o with = NATA's
‘accrediation requirements
Noosa SLSC.
Certificate Number: 100701 Accrodited for compliance with
SSOMEC 17025,
Date: 15022008. Date Received: 3001/2008 Date Tested: 31/01/2006 Page: 1 of 1
(1:5 susp.)
1M NaCl
ty
for and on behalf of Soll and Water Laboratories PA,
‘Samples supplied by others
‘Samples tested in ‘as received condition
‘The results of the tests, calibrations and/or measurements included in this document are traceable to Australianynational standards
1
2
3.
4. NATAis a signatory to the APLAC mutual recognition arrangement for the mutual recognition of the equivalence of tasting, calibration and inspection reports.
Page 45
$@0b D3V0S1 Ua Boren GLUnD 40} peypaxoy swawembas =» uogeypanog ouviiasuoay ‘poeoaee HORE. 1» o Bs] SRUEPURIS RUCRELUBIEASTY 0} EER) G42 ]UBLUTOOP 61] LU] PEPNPUY S|UALUENSEALL JO/PUB SUOREAGIED ‘SISE) BY] JO SINSY OUL uogpuan panRoa se, ul peysen SORES svatgo Aq papddns saxdiues “S002 SALE LOU AEIRIONET NOS NERS DEN, sca a pagosgp stmt i Sau BONDS Y FEN 40 WOUIIESOQ PUETSUBEND | 40'0 S0z o'o | oo Szz 00Z 90-92+¢t | 9040420 oc £90 i ¥ i Sz hb 00°8 80-994¢1 | 9009380 Ca 200 ost 90-924-7Z0 | SO-UBMOt 100 O't $0-99+7Z0} BO-UP-OF 190 osz 80-99+Z0 | BO-UEOT £ loo o 00's 9O-99s70 | BOC OT. Qn tom) ] (sw) tue ed [GON md) | Oe (core) | mmm) meus] fla | fdecg | eoyscR | PaerkeoD | panos ae = wea |e ann | Paatres | mae pen ~noneoemuepy am | ca | onde SZEZCUE JEGUINN POH 904945) FIED ‘OSTS eScON SETH) JOqUIN J8y ° 0000) 4OqLUNN SyeyNI8D (ez 8 vez "Ezz ZBL Zve SpoRU) WL ebeg “SIS PFD SEM BuBMETy ‘enUaNY LOPONpAlY 11 ‘PT Ad Guyseuug shenns pos 04 SOY TSS APIS TaD SIGE INTUINS SGTINpSy WT |WOI POO? CTD VOM JseKS ARH GL westsesme NG 1/ dl SO1IOeIOGE'T FIeY\ 2 [10S ieee =e
Page 46
Project 305-2325 February, 2006 # SOIL SURVEYS ENGINEERING
Page 47
91s
PV! o-czez-soe 9871S SAVAH VSOON|_____ 220310
‘ON ONIMVU . , NV 1d SLIS 90-aa4-St
aiva
SYSSANISNA IWOINHDSLOS9S ONILINSNOD
OaLIWITALd QNINSSNIONA SASANNS TIOS a,
SABAING oS F- area
ee aren Tema rf
ace eneneeap--es
io i
ret
ot
| joe
i
; ot 4
Page 48
LL] 29590
=ay] ‘ey tana se
e*t
nual prsattn a Hs
OOz 4 398039 “@ ‘SNIQKO "3
210% prow! pepe
£002 AYH Wadd¥) “1 VaNISAdd Ss
a0] wea sta]
20H OF
vr
OL1 ‘Ald WAds
Waly yDuNy snus
SYB3BNIONA ONILINSNOD
VSOON GOL
No wor2UpoUussep «WYN?
9060 YL4S LO “XWS Lead 9095 LO “Hd
9959 GTO. JTUAVSOON "SLS SYHOHL @ AUYW UN)
PIT Aid GTaIsHOLIG dv¥GdiN
oe Nyuy
nr PEN) CUYDOSSY
’ JOULNOD NOISONS
GNV SYYOMHLYV4
TUL NAVIN
‘OSTS
SdV3H YSOON 10)
Sdv3H VSOON
133a1S SONILSVH
SNOILIGGY CNV
SNOMVUALIY daSOd0ud
rad
ed
r
parm ton} ad] tay
NOISSHGNS SHIM TYNOMLYYIO | LOCO} ¥
"BLS NO
QMO 30 LNAWMIINTHHO) FUOLIG STHAYIS ORUSDG THY
ONILYDO1 YOS TTBISNOdSIY 29 OL St YOLIVYINOD SHL
TAATT JVIENS OIHSINIY SALONIT gz
‘WAAR CRLVAVKY S3L0NI0 a2"
‘TBAT DNUSIXE SILONIO &
oe Tei
igen
Sher
|;
Ww lv GSngTUKN M251 ITS
Ee
wa a > 8 4
NVid ALIS
LigKOL¥) ONS LY
UTWAVE LNARITES 3HAOYd
O66-GELE SY NI IND 135 S¥ GUVONVIS | TAI] ¥ OL
US3NDND TVINHIILOID ¥ AG CIHMLYID 39 OL S| ROWIVGHO) THY TI¥
V2 682L “SV OV
AUSN30 ABO %S6 1S¥I] LY 04 C3I¥dKO) CNY SY2AVT BOOZ
"X¥H NM) GUY 1d 38 OL SI THs SIML “%01 40 2OVNNISHS UVANIT "XY
ONY %02 30 X30NI AIDILSYId “X¥H * GOO) 40 3ZIS INOLS “XYK
%& JO NOLYIUDIGS YA) “NIM ¥ 3AVH OL THd O3AOUddY C3LYCdHt
“TUS OIAOUddY OILYOdH! HLM CIV IdFa 32
OL Sl TVIMALVH SIKL “LIS WOU4 C2AOW3Y ONY OZLYAVIX3 30 OL SI
* M3BNDNG 3AL Ad 031230 S¥ * CNNOYD TIGVLINSNA ANY CNY G3710Y
34004d N3HL 38 O1 SI AVMIAIUO ONY WYOSLYTd ONIOTING JHE
“BUS SIHL NO TU3 Td S¥ 3S BOs
THVANS LON SI TMALYW SIHL “AVAIAIMO ONY HYOJI¥Id OWING
FAL ROU C3ddULS 3@ 01 UY BILEYW JINVOYO ONINIVINO) STOS
* LON SNYOMHLYV
SHUOK
SNIOTING YOd AYMIA
ALRADNOD DNLLSIXE 35/1
v
puorey
owen
¥ald FWLX3ILOI9
ONNOYD OLNI
wwa09 N3AC
SLO WLS
"NIG O3A0¥ddY NY _NIHLIM O3NIV1NO)
3@ O1 HSIGANY NOILINYISNOD THY “SxYOM ONIUNG
“ORHSITGV1S3 St ONIDVISONY' ONY Y3A0) SS¥YD
TUNN GANIVINIVW 39 TIVHS GNY “SXYOMHLUY3 40
ANSWIINIWRO) FYOSIG 03193YI 38 OL $3IN3
“SHINAI LNIWIGIS JO AVM Ad
S3BVONNOG FHL OL TOHINOD LNIHIG3S JOIAOYd
* YONINO) INAWIaS
FONSI TOYLNOD LNSWIG3SS
e
wuz
Devs
t
NOILI3UIO
V38V O38YNLSIO
HS3W T33LS
YO J8IM
oe emmy dor
Page 49
Ls to) ena] 695 Way cones ae FITS j NOULYURGA Hos TONNO) JUS YSOON JHL OL C3LLMBNS ONY
ao ———————— eae OLN 38142 38 SMW LIVYINO) ZDNVAGLNYH Y “STVAQBLNI
od ese os 0, 1279 8 O ONY "BAYH 3S¥@ GVH R1D¥<WO) $4 46) 40 [OS] MINOW € LY 'YO12¥4LNO) C3AGUddY {3HLO UO ‘eBYNLIYSONVH
wit | mwa | baono0 > a wwugot NO GVS AVA3ARO 3180N0) 20H. SHS, HHL AG C3AOH3Y 38 OTNOHS 11S ONY SVX ONY TO 3HL
oa i mona
lowe AVM | uaddva | WanusAdd °S | NV 1d JIS GRUNDY SV “NW SZZ HSH 4¥7 STWAGRLNI BV TNSY
WAA0) ws? ~ OL SIH 2L1S HLM COINS LV 13NSV@ INVANTI0d SSOWD 3HL NVIT) ONY 1934SNI OL
uct AYES 25¥a OvOR GBL2¥dHOD We 88) 0 [00H] YOLDVAINOD ¥ 3DV9N3 TIVHS GAIT) JUNS 3H1 0 LNSHAOWNVH JHL
LD aL SINVINTIOd $SO¥D SV TAM SY 3S¥3U9 ONY
‘WO $19FTIO) VEL LNVLNTIOd SSOYD 90S0Id SO) CYVHYIAR 3HL
*“V'd'D 0d NV Id JINVNSINIVW
yar) youngansys
SUFINIONS_ONITINSNOS
VYSOON GOL
Rorwor2uppow@ubisap —: YVH-3
9060 19S LO "XVS § —-LLBO LYS LO “Hd
9957 G10 3TIAYSOON “SLS SYHOHL ? AUVH "UND
PY Ald 7aISHOLIG dvadIN
7006 “ON “DUO “GIS
“TSN HUA DNVGYODY Ne
SNISSON) BV INDHIA 3134)N0)
YALVMAYOLS
GNY YVdYdvO
‘YSTS
SGV3H VSOON 40)
Sdv3H VSOON
L3a3uLS SONILSVH
SNOLLIGGY GNV
SNOILVUSL1V G3SOd0ud
ane
NOISSINGNS SYYOM TWNOLLVYRdO | LO'L'E
SANSH3UINOSY TONG) OL C3SIAIY | 10°68
home soo) ee
v
4
9 WW eve) doy
“2S NO
MHOM JO LN3W3DNSWNO) 34039 SIWAYIS ONUSIXG TY
NLLYDOT YO4 FIGISNOGSY 38 OL SI YOLIVYNOD 3HL
TAT] DVSUNS CGHSINY S3L0NI0— g-7
‘TRA31 G3LVAVIX3 S3L0N30 wz"
TAA31 SNLLSIX] S3L0N30 s
Page 50
Fi 4.70
EXISTING CONDITIONS
STEP STEP @ STEP @
CONSTRUCTION PROCEDURE :
1. INSTALL STEEL SHEET PILING ADJACENT TO
EXISTING SURFCLUB BUILDING AS SHOWN ON
PROGRESSIVELY EXCAVATE SAND IN FRONT
OF SHEET INSTALLING ‘DEAD MAN’
ANCHORS AS SET OUT ON THE DESIGN
CERTIFIED BY A GEOTECHNICAL ENGINEER
AND SUPPLIED BY THE PILING CONTRACTOR
ALL EXCAVATED CLEAN SAND IS TO BE
PLACED ON THE BEACH DIRECTLY IN FRON
C OF THE SURF CLUB
t
SHEET PILING NOTE :
OURS TO UOTE Sal Geen eke® ND BESTALL
600 DIA. CONCRETE AND GROUND BEAMS
SPRAY SILICA FUME CONCRETE | 5¢ MPa @ 28 DAYS } TO FACE
OF SHEET PILING TO BASEMENT WALL
« FORH- AND POUR GROUND FLOOR SLAB OVER
CONCRETE VEHICULAR CROSSING g
IW ACCORDANCE WIFH N:S.C.
‘STD, DRG. No. 9002 '
in 24, 219 ls a
i. ol 6
DATUM 0.00 1
FOUNDING LEVEL REQUIRED FOR PILE
CAPACITIES, IS TO BE CONFIRMED BY
SOIL SURVEYS ENGINEERING PTY, LTD.
RL. -9.00
ESTIMATED NOMINAL DEPTH
VERT. SCALE 1: 100
HOR. SCALE 1: 100
TYPE WALL CONSTRUCTION
‘SECTION A
SECTION B SIMILAR
1000 800 600 400 200 9 ‘Lom
a — rt — eee
SCALE 1; 20, UNREDUCED AT AI
STEP ©
CRACK CONTROL JOINT - C
DRIVEWAY LONGITUDINAL SECTION
PROGRESSIVELY EXCAVATE AND
“DEAD MAN’ ANCHORS AS
CRACK-A-JOINT
OR SAW CUT
PROVIDE JOINTS TO SLAB ON GROUND
AT 6.0M MAX. CRS. BOTH WAYS
POLYTHENE MEMBRANE YQ
(1 Sn SAND BEDDING
| | |
KEYED JOINT - KJ
PROVIDE JOINTS TO SLAB ON GROUND
AT 6.0M MAX. CRS. BOTH WAYS
REVISED TO COUNCIL REQUIREMENTS
OPERATIONAL WORKS SUBMISSION
PROPOSED ALTERATIONS
AND ADDITIONS
HASTINGS STREET
NOOSA HEADS
for NOOSA HEADS
S.L.S.C.
SITEWORKS AND
DRIVEWAY DETAILS
ASSOCIATED CONSULTANT
Architects
MIDDAP DITCHFIELD Pty Ltd
CNR. MARY & THOMAS STS. NOOSAVILLE QLD 4566
PH. 07 5474 0677 FAX. 07 5474 0906
E-MAIL ; [email protected]
TOD NOOSA
CONSULTING ENGINEERS
Structural Civil
20 Mary Street, Noosaville
P.O Box 233, Noosa Heads. 04567
Phone 107) 5449 9600 Fax (07) S449 9496
EMail. tedneesalbigpondnet cu
Used in these records
07/1571 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.