Council archive · source document
07/1571 - Response to Information Request [As Published] · 142007.1571
Item 14 Item 12 Item 13 “Item 14 Item 15 Item 16 We trus' Refer to Tods revised drawings. The clearance at the gate is 2.2m Floor Level is RL 2.25 Uls of soffit is RL 4.45 As discussed on the 25 September meeting the Surf Clubs' Contractor will make application for site specific construction traffic and parking plan and confirm ail details at the pre start meeting. Refer Tods amended drawings for line marking and signage. Amended drawings indicate tank location. _ Refer attached report from Soil Surveys. t the above is satisfactory. Please call if you require any further information. Yours faithfully P & DITCHFIELD PTY LTD ARCHITECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1571 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.