3.3 Developed Scenario
The proposed development has been incorporated into the WBNM model by
adjusting the site sub-catchments and the fractions impervious values. Fraction
impervious values of the existing and proposed scenarios are provided in Table 10
below.
Table 10: WBNM Sub-Catchment Fraction Impervious Values – Developed Scenario
WBNM Sub- Developed Scenario Existing Scenario
Area (ha)
Catchment Impervious (%) Impervious (%)
SUB 1 0.164 89 69
Peak flows tabulated in this report represent the peak values extracted from the
modelled range of storm events.
Table 11: Developed Scenario WBNM Outlet Peak Flows
Existing Peak Flow Developed Peak Flow Change in Peak Flow
(m3/s) (m3/s) (m3/s)
1 year 0.048 0.05 0.002
2 year 0.062 0.063 0.001
5 year 0.078 0.079 0.001
10 year 0.088 0.089 0.001
20 year 0.101 0.102 0.001
50 year 0.112 0.114 0.002
100 year 0.125 0.127 0.002
It can be seen that the peak flows have increased to the catchment outlet. This is a
result of the development site increasing the impervious area. Mitigation within the
catchment will be required.
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Amend Application and Response to DSDIP's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.