Delegated Report - Code - Planning RAL21 0026
Currency Period
5. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 20 May 2026, unless
an application to extend the currency period is approved by Council.
Boundary Encroachments
6. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
comply with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice
b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
ENGINEERING
Site Access and Driveways
7. Two sealed access driveways (one to each of the proposed lots 31 and 32) must be provided
from Currawong Cres to all parking and manoeuvring areas of the development. The works
must be undertaken in accordance with the conditions of this approval and must include in
particular driveway crossovers generally in accordance with Councils standard drawings RS-
049 and RS-050.
Stormwater Drainage
8. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this approval.
Services
9. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
10. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
11. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
12. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
13. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
14. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
15. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
Earthworks for Commercial and Residential Developments.
Page 6 of 13
Document Set ID: 21928199
Version: 7, Version Date: 26/05/2022