Delegated Report - Code - Planning RAL21 0026
16. Where the development involves excavation or filling over, or adjacent to, drainage, water
supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
provide a freeboard of 100mm above the finished ground surface level.
17. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
18. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
OPW21/0303
APPROVED PLANS
19. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
21/8698-2 B Proposed Site Plan March 2022
Prepared by Crocker & Associates Pty Ltd
21/8698-3 B Proposed Driveway to Lot.31 March 2022
Prepared by Crocker & Associates Pty Ltd
CURRENCY PERIOD
20. The Currency Period for this development approval lapses if the development has not
substantially started by 13 May 2024, unless an application to extend the currency period is
approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
21. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
22. Copy of approved plan 21/8698-3: “Proposed Driveway to Lot.31”, duly signed by the
consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to
Council’s Engineering Officer Construction prior to the “pre start” meeting
23. A condition report including photographs of the frontage of the site must be completed and
submitted to council prior to the prestart meeting.
24. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
25. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The
pre-start meeting must include the relevant parties for the following aspects of the works:
Page 7 of 13
Document Set ID: 21928199
Version: 7, Version Date: 26/05/2022