Delegated Report - Code - Planning RAL21 0026

of 13

Page text shows just the words. Original shows the document exactly as it was published.

               16.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               17.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               18.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               OPW21/0303
               APPROVED PLANS
               19.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan No.           Rev.   Plan/Document Name                            Date

                           21/8698-2          B      Proposed Site Plan                            March 2022
                                                     Prepared by Crocker & Associates Pty Ltd

                           21/8698-3          B      Proposed Driveway to Lot.31                   March 2022
                                                     Prepared by Crocker & Associates Pty Ltd

               CURRENCY PERIOD
               20.    The Currency Period for this development approval lapses if the development has not
                      substantially started by 13 May 2024, unless an application to extend the currency period is
                      approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               21.    All necessary approvals from external service providers (e.g. Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               22.    Copy of approved plan 21/8698-3: “Proposed Driveway to Lot.31”, duly signed by the
                      consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to
                      Council’s Engineering Officer Construction prior to the “pre start” meeting
               23.    A condition report including photographs of the frontage of the site must be completed and
                      submitted to council prior to the prestart meeting.
               24.    Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               25.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:

                                                                                                      Page 7 of 13

Document Set ID: 21928199
Version: 7, Version Date: 26/05/2022
Log in to download the original file

Delegated Report - Code - Planning RAL21 0026.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.