MCU14/0024 - Response to Information Request - Attachment 3
LANDSLIDE RISK MANAGEMENT AGS SUB-COMMITTEE SOME GUIDELINES FOR HILLSIDE CONSTRUCTION GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE ADVICE GEOTECHNICAL Obtain advice from a qualified, experienced geotechnical consultant at early Prepare detailed plan and start site works before ASSESSMENT. sage of planning and before site works. geotechnical advice, PLANNING SITE PLANNING Having obtained geotechnical advice, plan the development with the risk Plan development without regard for the Risk. atising from the identified hazards and consequences in mind. DESIGN AND CONSTRUCTION HOUSE DESIGN Use flexible structures which incorporate properly designed brickwork, timber | Floor plans which require extensive cutting and of steel frames, timber or panel cladding. filling. Consider use of split levels, Movement intolerant structures. Use decks for recreational areas where appropriate. SITE CLEARING Retain natural vegetation wherever practicable. Indiscriminately clear the site. ACCESS & Satisfy requirements below for cuts, fills, retaining walls and drainage. Excavate and fill for site access before DRIVEWAYS Council specifications for grades may need to be modified. geotechnical advice. Driveways and parking areas may need to be fully supported on piers. EARTHWORKS Retain natural contours wherever possible, Indiscriminant bulk earthworks. Cuts | Minimise depth, Large scale cuts and benching. Support with engineered retaining walls or batter to appropriate slope. Unsupported cuts. Provide drainage measures and erosion control. Ignore drainage requirements FILLs | Minimise height. Loose or poorly compacted fill, which if it fails, Strip vegetation and topsoil and key into natural slopes prior to filling. may flow a considerable distance including ‘Use clean fill materials and compact to engineering standards. onto property below. Batter to appropriate slope or support with engineered retaining wall, Block natural drainage lines. Provide surface drainage and appropriate subsurface drainage. Fill over existing vegetation and topsoil. Include stumps, trees, vegetation, topsoil, boulders, building rubble ete i ROCK OUTCROPS | Remove or stabilise boulders which may have unacceptable risk, Disturb or undercut detached blocks or & BOULDERS | Support rock faces where necessary. boulders. RETAINING Engineer design to resist applied soil and water forces, Construct a structurally inadequate wall such as WALLS Found on rock where practicable. sandstone flagging, brick or unreinforced Provide subsurface drainage within wall backfill and surface drainage on slope | blockwork. above. Lack of subsurface drains and weepholes. Construct wall as soon as possible after cut/fill operation. FOOTINGS Found within rock where practicable. Found on topsoil, loose fill, detached boulders ‘Use rows of piers or strip footings oriented up and down slope. or undercut cliffs, Design for lateral creep pressures if necessary. Backfill footing excavations to exclude ingress of surface water. SWIMMING POOLS | Engineer designed. Support on piers to rock where practicable. Provide with under-drainage and gravity drain outlet where practicable. Design for high soil pressures which may develop on uph. may be little or no lateral support on downhill side. DRAINAGE . z SURFACE | Provide at tops of cut and fill slopes. Discharge at top of fills and cuts. | - Discharge to street drainage or natural water courses. Allow water to pond on bench areas. Provide general falls to prevent blockage by ion and incorporate silt traps. i inimi: tion and make flexible where possible. Special structures to dissipate energy at changes of slope and/or direction. SUBSURFACE | Provide filter around subsurface drain. Discharge roof runoff into absorption trenches. Provide drain behind retaining walls. ‘Use flexible pipelines with access for maintenance. Prevent inflow of surface water. Septic & | Usually requires pump-out or mains sewer systems, absorption trenches may | Discharge sullage directly onto and into slopes, SULLAGE | bepossible in some areas if risk is acceptable. Use absorption trenches without consideration Storage tanks should be water-tight and adequately founded. of landslide risk. EROSION Control erosion as this may lead to instability. Faifure to observe earthworks and drainage CONTROL & Revegetate cleared area, recommendations when landscaping. LANDSCAPING DRAWINGS AND SITEVISITS DURING CONSTRUCTION DRAWINGS Building Application drawings should be viewed by geotechnical consultant SITE VISITS Site Visits by consultant may be appropriate during construction/ INSPECTION AND MAINTENANCE BY OWNER OWNER’S Clean drainage systems, repair broken joints in drains and leaks in supply RESPONSIBILITY pipes. Where structural distress is evident see advice. Ifseepage observed, determine causes or seek advice on consequences. Australian Geomechanics ~ March 2000 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0024 - Response to Information Request - Attachment 3Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.