Council archive · source document
MCU14/0024 - Response to Information Request - Attachment 3
LANDSLIDE RISK MANAGEMENT AGS SUB-COMMITTEE
EXAMPLES OF GOOD HILLSIDE PRACTICE
ROOF WATER
PIPED OFF SITE ig
£5 — MANTLE oF son
CUT & Fit
& ROCK FRAGMENTS
PAMIMISED
VEGETATION ICOLLUVII
INTO ROCK
SUBSON ORAWAGE MAY
BE REQUIRED INSLOPE
SEWERAGE EFFLUENT PUMPED-GUT
OR CONNECTED TO SEWER.
TANKS ADEQUATELY FOUNDED
GINEERED RETAINING WALLS
WITH SURFACE & SUBSURFACE
DRAINAGE CONSTRUCTED
BEFORE HOUSE
EXAMPLES OF POOR HILLSIDE PRACTICE
UNSTABILISED ROCK [DPPLES
SLOPE £ ACTIVATES SUP
POSSIBLE TRAVEL DOWNSLOPE WHITH
MPACTS OTHER DEVELOPMENT
Figure J1 Illustrations of Good and Poor Hillside Practice
92 Australian Geomechanics - March 2000
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0024 - Response to Information Request - Attachment 3Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.