Figure 1: Overview of the low-impact stormwater strategy.


The site currently has high infiltration rates
Percolation testing on the site was carried out in September 2012 by Soil Surveys . The field test
method employed in this investigation, ie. Constant Head Test, was carried out in accordance
with AS1547-2000, Appendix 4.1F. At the test location, a 100mm diameter borehole was drilled to
a depth of 500mm. The test hole was then filled to a depth of 250mm, the well permeameter was
put in place and the test commenced. When the fall became constant, ie. 10% or less change
between successive readings, or flow eased, the test was completed. Readings were taken at 30
second intervals. At four locations across the site, saturated infiltration rates of 4.0, 4.2, 4.6 and
3.9 m/day were recorded, or an average rate of 170 mm/hr.

High infiltration rates are preserved in the design
   • For 95% of the site, ground-level permeability is maintained.
   • 68% of the site is free of structures, and significant amount of the site will remain
       untouched by construction activities.
   • 25% of the site is roofs, and most of the buildings are lightweight structures which sit on
       raised piers, preserving ground-level permeability beneath them. Buildings are connected
       via raised boardwalks rather than concrete pathways;
            o 40% of roofs drain to tanks
            o 40% of that water is used, primarily for toilet flushing (accounting for about a 0.4
                ML/yr reduction in runoff volumes).
            o All surplus roof water discharges to infiltration trenches beneath buildings (the
                infiltration trenches have a 100 mm extended detention, are filled with clean
                washed gravels, and have been incorporated into the structural design of the
                building footings)
   • Only 5% of the site consists on slab-on-ground construction. This was necessary to
       provide for the Sound building (for acoustics), and part of the Create building sits on a

Used in these records

About this file

File size
258 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2013-05-10 Memo Noosa FLC stormwater.pdf · 258 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.