2013-05-10 Memo Noosa FLC stormwater · MCU12/0133

of 6

Text shows just the words. Original shows the document exactly as it was published.

Bligh Tanner                                                                                      Page 3 of 6




         mounded area where it made sense to build directly onto natural surface. Roof runoff
         from the roofs of slab-on-ground buildings is directed into infiltration trenches located
         beneath adjoining buildings/boardwalks.
    •    7% of the site is carpark, and a permeable gravel carpark pavement is proposed using the
         Geobrics geoweb product (refer Figure 1 below).




Figure 2: Sample installation of ‘Geoweb’ trafficable permeable pavement at Hervey Bay.


High infiltration rates will be preserved post-construction
Construction activities have the potential to impact on the natural permeability of the site soils
through generation and inappropriate disposal of fine materials, silts and slurries, and excessive
compaction of soils. This will be managed on this site as follows:
    • Construction drawings require infiltration tests to be conducted before and after
       construction (refer drawing C001 and C100).
    • Construction vehicle access will be limited to defined routes to minimise compaction,
       although the infiltration rate of the site sands is likely to be fairly resilient to moderate
       compaction.
    • The avoidance of slab-on-ground construction will reduce the risks of concrete slurry and
       the like being poorly disposed of.
    • The contractor is to submit detailed work method statements to the superintendent for
       approval that clearly document how the infiltration rate of site soils will be preserved (as
       documented on drawing C001 and C100). This is to include details about:
            o how the site will be accessed and how potential compaction from vehicle and plant
                movement will be managed
            o how the infiltration systems beneath buildings will be constructed, and protected
                from construction debris
            o how liquid, slurry and fine particular materials will be handled
            o rectification measures to restore pre-development infiltration rates where
                necessary.

ANALYSIS
Conventional hydrologic analysis techniques are not well suited to analysing the hydrologic
performance of the site due to the high infiltration rates of the in-situ soils and the atypical nature
of the development. For example, the commonly used rational method is based on a coefficient of
runoff approach, and so would estimate some runoff would be generated from almost any storm.
However the rainfall intensity (I100yr, 26 min) of 163 mm/hr is less than the infiltration rate of the site
soils, and so no surface runoff is likely to be generated for a 100 yr event across the whole site.

Used in these records

About this file

File size
258 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2013-05-10 Memo Noosa FLC stormwater.pdf · 258 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.