Note that very short times of concentration would lead to some runoff from the front of the site
due to partial area affects.
A continuous simulation over a 10 year period was undertaken with MUSIC (the modelling
approach is described in more detail in the Stormwater Management Plan). This analysis takes
into account baseflows as well as surface runoff, and demonstrates that post-development flows
were never higher than predevelopment flows, as shown in the cumulative frequency graph
shown in Figure 1 below.
A subsequent analysis in MUSIC, using ‘secondary links’ to isolate surface runoff from baseflow,
shows that, for the peak surface flow for the period of analysis reduces from about 270 L/s to 220
L/s, a reduction of about 20%. Further results of this analysis are presented in Table 1. It is
important to note that these results are highly conservative (i.e. they overestimate runoff) as they
assume standard rain-fall runoff parameters from the MUSIC modelling guidelines (Water by
Design V1 2010) that were calibrated to streams in catchments with lower infiltration rates than
the sandy soils of this site. Nonetheless, as the same ‘forested’ rainfall-runoff parameters have
been used for the pre and post development cases 1 they provide a useful guide as to the relative
impacts of the development.
Table 1 Summary of results from MUSIC modelling
Predevelopment Post development
Maximum flow (surface flow and 275 L/s 225 L/s
baseflow)
Maximum flow (surface flow only) 274 L/s 220 L/s
Mean annual flow (surface flow 2.9 ML/yr 2.08 ML/yr
and baseflow)
Mean annual flow (surface flow 1.8 ML/yr 1.3 ML/yr (rainwater
only) tanks account for 0.4
ML/yr)
1
The 600 m² turfed area uses ‘Urban’ rainfall runoff parameters to reflect the reduced infiltration rates
associated with turfed area associated with topsoil and compaction resulting from prolonged use.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2013-05-10 Memo Noosa FLC stormwaterRelated documentApplication case desk ↗
About this file
- File size
- 258 KB (small file)
- File type
No other editions are linked here.