The most recent flood study (Flood Impact Assessment, Covey, January 2026) has confirmed
that the central area where the proposed compost facility is to be located is mostly free from
flooding during a 1% AEP event for Stage 2 (refer Figure 4, above). The reduced ground levels
in this part of the site are expected to remain about the same, therefore there is minimal if any
change to the flood modelling.
Having regard to the Flood Hazard Overlay Code the following comments are provided:
• The proposed development will maintain the safety of people and property (PO1);
• The design of the proposed development will be resilient to flood events, with no new
buildings/structures located below a 1% flood event (PO6);
• The proposed development supports and does not unduly burden disaster
management response or recovery or capabilities (PO7);
• The essential community infrastructure will be able to function effectively immediately
after an extreme flood event, including for the composting facility (PO9);
• Any earthworks required by the development will be minor and will not result in
increased flooding or ponding or affect the overall hydrology of the site and
surrounding land (PO10); and
• The proposed development will not worsen and will improve public safety and the
protection of the environment by ensuring hazardous waste materials including
leachate will not be affected by flooding within the site (PO11).
The proposed development complies with the Flood Hazard Overlay Code.
10.2.5 Landslide Hazard Overlay
Under the Landslide Hazard Overlay, parts of the subject land are affected by the mapping
and designated a Moderate Hazard Area (refer Figure 11).
Figure 11 – Extract of Landslide Overlay
While part of the land is affected by the landslide overlay, the subject land where the proposed
composting facility is to be located is relatively unaffected. In any event, the landslip hazard
23026 – Noosa Resource Recovery Centre (NRRC) – Composting Facility Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report - Other Change Composting Facility .pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.