Skip to the record
Every meeting, every word.

Council archive · source document

Development Application part 1 of 2 · OPW12/0287

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

ODD
1.12      Is any of the proposed operational work tidal work, other than excluded work defined under the
          Sustainable Planning Regulation 2009?


DNo
[2J Yes        .     It is recommended that you complete part 9 of this checklist.


1.13      Is any of the operational work proposed to be carried out within a coastal management district?



DNo
[2J Yes        .     It is recommended that you complete part 10 of this checklist.


1.14      Is any of the proposed operational work for constructing or raising waterway barrier works under the
          Fisheries Act 1994?


[2J No
DYes           .     It is recommended that you complete part 11 of this checklist.


1.15      Is any of the proposed operational work to be carried out completely or partly within a declared fish
          habitat area under the Fisheries Act 1994?



[2J No
DYes           .     It is recommended that you complete part 12 of this checklist.


1.16      Is any of the proposed operational work removing, destroying or damaging marine plants under the
          Fisheries Act 1994?


[2J No
DYes           .     It is recommended that you complete part 13 of this checklist.


1.17      Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
          Rivers Act 2005?


[2J No
DYes           .      It is recommended that you complete part 14 of this checklist.


1.18      Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
          state-controlled road?


[2J No
DYes           .      It is recommended that you complete part 15 of this checklist.


Section reference:
.         Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2


Ipart 8 Taking or interfering with water
           -




                                                                                       Operational works IDAS checklist 4
                                                                                                        -




                                                                                              Version 1.0 December 2009


[OCR of page images]
LIL

 

 

1.12 Is any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 2009?

 

 

(No
Kk] Yes

 

It is recommended that you complete part 9 of this checklist.

 

 

1.13 Is any of the operational work proposed to be carried out within a coastal management district?

[No

XX] Yes ° It is recommended that you complete part 10 of this checklist.

 

 

 

 

 

1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994?

 

 

KX] No

(Yes ° It is recommended that you complete part 11 of this checklist.

 

 

 

 

1.15 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 1994?

 

 

KX] No
(Yes

 

 

It is recommended that you complete part 12 of this checklist.

 

 

1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 1994?

 

 

[IX] No
Yes

 

It is recommended that you complete part 13 of this checklist.

 

 

1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

 

 

KX] No

L] Yes ° It is recommended that you complete part 14 of this checklist.

 

 

 

1.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?

 

 

Ix] No

Yes ° It is recommended that you complete part 15 of this checklist.

 

 

 

Section reference:
e Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2

 

 

Part 8 - Taking or interfering with water

 

 

Operational works - IDAS checklist 4
Version 1.0 December 2009

Used in these records

About this file

File size
9.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2.pdf · 9.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.