8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (otherthan using a water truck to pump
water)?
[8JNo
. You must complete Taking artesian or sub-artesian water -IDAS form 12.
DYes . This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.
8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (otherthan using a water truck to pump water)?
Go to question 8.12.
10NO I’
DYes
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (otherthan using a water truck to
pump water)?
Go to question 8.14
10NO I’
DYes
8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000,for interfering with overland flow water (otherthan using a water truck to pump
water)?
Go to question 8.19
10NO I’
DYes
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply (Safety
DYes ~ No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent DYes ~ No
. If yes to any of the above you must complete Referable dam IDAS form 16.
-
. This application requires assessment by the Department of Environment and Resource Management
(DERM).If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Section reference:
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
. Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
. Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
. Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
. Wild Rivers Act 2005, section 43A
. Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)
. Relevant wild river declarations
Operational works -
IDAS checklist 4
Version 1.0 December 2009
[OCR of page images]
LILO
8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?
IX]No
° You must complete Taking artesian or sub-artesian water - IDAS form 12.
Yes ie This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.
8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?
KX] No ° Go to question 8.12.
L] Yes
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?
KK] No . Go to question 8.14
(Yes
8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
water)?
KX] No ° Go to question 8.19
CL] Yes
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply (Safety iS
and Reliability) Act 2008 U1 Yes No
to increase the storage capacity of a referable dam by more than 10 per cent OO Yes &] No
° If yes to any of the above you must complete Referable dam - IDAS form 16.
° This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Section reference:
° Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
° Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
° Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
e Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
. Wild Rivers Act 2005, section 43A
. Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water)
° Relevant wild river declarations
Operational works - IDAS checklist 4
Version 1.0 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 9.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.