Original source · versioned page text
2017-04-18 GC Agenda Att 3 to Item 5 Business Plan Cooroy Memorial Hall
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn turnover which will ensure viability into the future. Some additional considerations for profit
budgeting would include audio visual equipment, replacement of tables and chairs, and
upgrades to the stage area to enhance the acoustics etc. Profit from year one will enable
provision for such upgrades meaning less fundraising and grant applications and potentially
less input from council once the hall has proved to be self-sustaining.
13. To ensure that the Association can break even and cover expenses the average rental would
only need to increase to $20.65 an hour or the hours rented would need to increase to 1,804
which is a small rise of 3.5%
14. Start-up costs for the Association amounted to the incorporation fee and web site set-up fees
which were paid by way of donation by members of the CMHA Inc. committee. This can be
reimbursed from profits once operations have commenced. Any other early startup costs
such as insurance can be paid for by donations received from local service clubs such as
Rotary who are working closely with CMHA Inc. during this period.
15. CMHA Inc. operations manager/hall coordinator will maintain an up to the minute web site
thus ensuring the public is aware of fund-raising and events, availability and contact
information as well as online application for hire.
4.2 Banking
1. Bendigo bank will hold the majority of CMHA Inc. funds. Commonwealth Bank, being a
t
$10 monthly gateway/transaction account fee in comparison to $40 monthly fee with
Bendigo is currently the preferred option on cost basis for the gateway/transaction account
af
required by the website’s online payment system and any card transaction.
2. Annexure 11 & 12 attached with further information
Dr
BUSINESS PLAN FOR FUTURE OPERATION OF COOROY MEMORIAL HALL MARCH 2017 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.