Department of Infrastructure, Local Government and Planning IDAS form 6—Building or operational work assessable against a planning scheme (Sustainable Planning Act 2009 version 3.1 effective 3 August 2015) This form must be used for development applications for building work or operational work assessable against a planning scheme. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: complete /DAS form 1—Application details O complete any other forms relevant to your application QQ provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning Regulation 2009. This form must be used for building work or operational work relating on strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. Mandatory requirements 1. What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable boxes.) Building work—complete Table A (opti ble B Table A a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? b) Are there any current approvals associated with this application? (e.g. material change of use.) No Yes— provide details below IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—3 August 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
Department of Infrastructure, Local Government and Planning List of approval reference/s Date approved (dd/mm/yy) | Date approval lapses (dd/mm/yy) Table B a) Whatts-the nature of the operational work? (Tick all applicable boxes.) > . Stormwater Water infrastructure Drainage works Earthworks Sewerage infrastructure Landscaping Signage ying vegetation under the planning scheme provide details Removal; Of trees on the nature strip that conflict with the location of the proposed driveway and pedestrian access (elevated timber decking). And; removal of unhealthy trees & limbs of trees outside the drive and path that pose property and personal injury risk, upon assessment & direction by Council's arbourist. And; construction of a concrete crossover from the unformed road edge to the property boundary and drive. b) _ Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.) No Yes—specify the number of lots being created c) Are there any current approvals associated with this application? (E.g. material change of use.) No Yes—provide details below List of approval reference/s Date approved (dd/mm/yy) | Date approval lapses (dd/mm/yy) IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—3 August 2015
Page 3
Department of Infrastructure, Local Government and Planning
2. What is the dollar value of the proposed building work? $
(Inc GST, materials and labour.)
3. What is the dollar value of the proposed operational work? $9,000
(inc GST, materials and labour.)
Mandatory supporting information
4. Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information Confirmation of | Method of
lodgement lodgement
All applications involving building work or operational work
Le .
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are C Yes Confirmed
recommended scales) which shows the following:
Othe location and site area of the land to which the application relates
(relevant land)
Q the north point
1 the boundaries of the relevant land
Othe allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
Q any existing or proposed easements on the relevant land and their function
0 any access limitation strips
0 all existing and proposed roads and access points on the relevant land.
A statement about how the proposed development addresses the local ( Yes Confirmed
government's planning schemes and any other planning documents relevant
to the application.
A statement addressing the relevant part(s) of the State Development Confirmed
Assessment Provisions (SDAP). Not applicable
Applications for building work {including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are Confirmed
recommended scales) which show the following: Not applicable
QO the north point
Othe intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
0 the room layout (for residential development only) with all rooms clearly
labelled
0 the existing and the proposed built form (for extensions only)
0 the gross floor area of each proposed floor area.
IDAS form 6—Building or operational work assessable
against a planning scheme
Version 3.1—3 August 2015
Page 4
Department of Infrastructure, Local Government and Planning Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are Confirmed recommended scales) which show plans of all building elevations and Not applicable facades, clearly labelled to identify orientation (e.g. north elevation). Plans showing the size, location, proposed site cover, proposed maximum Confirmed number of storeys, and proposed maximum height above natural ground level | Not applicable of the proposed new building work. Plans showing the extent of any demolition that is assessable development. Confirmed Not applicable Applications for operational work involving earthworks (filling and excavating) Drawings showing: Confirmed 0 existing and proposed contours Not applicable 01 areas to be cut and filled QO the location and level of any permanent survey marks or reference stations used as datum for the works QO. the location of any proposed retaining walls on the relevant land and their height 01 the defined flood level (if applicable) Othe fill level (if applicabte). Applications for operational work involving roadworks — Drawings showing: Q existing and proposed contours Not applicable Q the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) OQ kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) QO edge of pavement where kerb is not constructed position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing material. oo goo0oo0oaooa Applications for operational work involving stormwater drainage IDAS form 6—Building or operational work assessable against a planning scheme Version 3.41—3 August 2015
Page 5
Department of Infrastructure, Local Government and Planning Drawings showing: Confirmed 0 existing and proposed contours Not applicable 01 drainage locations, diameters and class of pipe, open drains and easements O manhole location, chainage and offset or coordinates and inlet and outlet invert levels 0 inlet pit locations, chainage and offset or coordinates and invert and kerb levels. Applications for operational work involving water reticulation Drawings showing: Confirmed 0 kerb lines or edge of pavement where kerb is not constructed Not applicable 0 location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs. Ooo0o0n0oo0no Applications for operational work involving sewerage reticulation Drawings showing: Confirmed location of all existing and proposed services Not applicable location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable). Onoonaaneanaonnoogd Applications for operational work involving street lighting Drawings showing: Confirmed location of all light poles and service conduits Not applicable location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of lighting levels. ona0gcnoo0no Applications for operational work involving public utility services Drawings showing: Confirmed any existing light poles and power poles Not applicable 0 any existing underground services Q details of proposed services IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—-3 August 2015
Page 6
Department of Infrastructure, Local Government and Planning O alteration to existing services. Applications for operational work involving landscaping works Drawings showing: ‘ Othe location of proposed plant species 4 aplant schedule indicating common and botanical names, pot sizes and numbers of plants QO planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details. Hooda Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure, Local Government and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agency. IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—3 August 2015
Used in these records
IDAS6.pdfRelated documentApplication case desk ↗
IDAS6.pdfRelated documentApplication case desk ↗
About this file
- File size
- 179 KB (small file)
- File type
No other editions are linked here.