Council archive · source document
IDAS6 · OPW16/0270
Attached to the e-mail Operational Works Application OPW16/0270.
Department of Infrastructure, Local Government and Planning List of approval reference/s Date approved (dd/mm/yy) | Date approval lapses (dd/mm/yy) Table B a) Whatts-the nature of the operational work? (Tick all applicable boxes.) > . Stormwater Water infrastructure Drainage works Earthworks Sewerage infrastructure Landscaping Signage ying vegetation under the planning scheme provide details Removal; Of trees on the nature strip that conflict with the location of the proposed driveway and pedestrian access (elevated timber decking). And; removal of unhealthy trees & limbs of trees outside the drive and path that pose property and personal injury risk, upon assessment & direction by Council's arbourist. And; construction of a concrete crossover from the unformed road edge to the property boundary and drive. b) _ Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.) No Yes—specify the number of lots being created c) Are there any current approvals associated with this application? (E.g. material change of use.) No Yes—provide details below List of approval reference/s Date approved (dd/mm/yy) | Date approval lapses (dd/mm/yy) IDAS form 6—Building or operational work assessable against a planning scheme Version 3.1—3 August 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS6.pdfRelated documentApplication case desk ↗
IDAS6.pdfRelated documentApplication case desk ↗
About this file
- File size
- 179 KB (small file)
- File type
No other editions are linked here.