001AB80D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
YS \ AO OP YRIGHT - ALL RIGHTS RESERVED
MY any form without the written permission of Blakeney Munns
AS Copying or reproducing the whale of part of this document i
Consulting Engingers constitutes an nfringement of copyright,
DISCLAIMER
> Blakeney Munna Consulting Engingers accepts ne responsibility fer
the accuracy er for any consequance resutting from the use
LEGEND er alteration of this drawing in electronic form
WE | ME |) GME CONSTRUCT TEMPORARY SEDMINT FENCE Or awings in electrenn term sheud be chechad for accuracy against
BS 62 the equivalent revision hard copy issued by Blakeney Munns
Consulting Engnesrs.
sm
CONSTRUCT TEMPORARY ENTRY/EXIT DIMENSIONS
Prior to commencing construction verity alt dimensions against
5a oo ONS TAUCT SANDBAG SEDIMENT TRAP Architect's, other Cansutant's and Sub-Contractor’s drawings.
Be t Dimensions are not ta be scaled or read electronically from this
VA (ye FN {A e drawing. Setout dumensians, ues spacitically shown, are to ba
\ (ee SF \ an hata NOTES ebtained from the Architect's or ether Consuttant's drawings
\\n \ Ere NL CONSTRUCT 5.0m x 3.0m x 0.2m DEEP GRAVEL SHAKE DOWN AREA oe
st
NI E=: i APR 09
OATE
N\ a : ik ARE PREPARED AS A GUIDE FOR CONSTRUCTION APPROVAL RPEQ No. 4469
| , SEDIMENT AND CONTROL MEASURES SHOWN ON THIS PLAN Ree Shea
: \ ‘| LAL i \ IMPORTANT Beury) Maan
BY COUNCKL. IT DOES HOT IN ANY WAY RELIEVE THE
fo CONTRACTOR OF HWS RESPONS@ILITY TO PLAN AND
IMPLEMENT ENVIRGNHENTAL PROTECTION MEASURES AS
5 Yr REQUIRED BY LAW, THE COUNC!L AND THE CONTRACT
WU wy) 6 r THAOUGHGUT THE WORKS.
ea
————
| 7S
|__| 1,008
ws, @ : \ 1 TI I & S
FB Od a
\% i alc " Ui, Nhe \) oO fy
El VT iy
\- \ -_—| Pp
PT
ae al Sanda overlap oy een Pp
—
onto kel ~
PSS ESOS PF {
& req T oS = a
oe ia —.—.—.5 ee a ————— es ee
Ly Rusot! Ff [oT
i ——____ BLS —_——« — — | —. —— ee ee + Ta ]oo wonns arbnovat | 50509
Three layers of sand [er [Pmcumany sue 30
a Gap detween bags with ends overlapped. [Pi [ereummary issue [27.0009] cwe_|
act as spillway,
ae” eh Rev. | [ bare _{iwitiais|
at
Sandbag Kerb Intet Sediment Trag, N.T.S. PROPOSED RESIDENCE
For 2ha catchment of lest LOT 10 PARK ROAD
Dire, NOOSA HEADS
Ee tiag, or
te,
1
QLD 4567
Sa win _—
RCP os Gatter grade
Stig Oe of #2. PROJECT
Ff %E OL Cc Undisturbed THE PENINISULA AVIATION
SP
XS
tn TRUST
27 SITE LAYOUT PLAN Uy Sat CUENT
Pa
SCALE 1: 100 CECILIA BROWN DESIGN
Perimeter Bank [without channel), N.T.S.
ARCHITECT
Drainage area 0.6ha. max. Slope gradient L? max SITE LAYOUT PLAN
EROSION AND $ IMENT CO ‘OL NOTES Stope length 69m tax.
OTHER MATTERS at]
GENERAL INSTRUCTIONS 9. FINAL SITE LAMDSCAPING WILL BE UNDERTAKEN AS SOON AS POSSIBLE Wire ef steel mesh. fi got as is}
W. ACCEPTABLE RECEPTORS WiLL BE USED FOR CONCRETE AND rr o
1, THIS PLAN IS TO BE READ tH CONJUNCTION WITH THE ENGINEERING AND WITHIN 20 WORKING DAYS FROM COMPLETION OF CONSTRUCTION MORTAR SLURRES, PAINTS, ACID WASHINGS, LIGHT-WEIGHT WASTE fr Cc
PLANS, ANO ANY OTHER PLANS OR WRITTEN INSTRUCTIONS THAT MAY MATERIALS ANO LITTER. Disturbed area
BE ISSUEO AND RELATING TO DEVELOPMENT AT THE SUBJECT SITE. 10. STOCKPRES WILL NOT BE LOCATED WITHIN 2 METRES OF HAZARD AREAS. ‘ 17, AMY EXISTING TREES WHICH FORM PART DF THE FINAL LANDSCAPING
THE CONTAACTOR WILL ENSURE THAT ALL SOM AND WATER INCLUDING LIKELY AREAS OF CONCENTRATED OR HIGH VELOCITY FLOWS PLAN WILL BE PROTECTED FROM CONSTRUCTION ACTIVITIES BY: HegSleo oy 4 Hf rT fo Posts driven
MANAGEMENT WORKS ARE LOCATED AS A MOAMUM AS SHOWN IN SUCH AS WATERWAYS. WHERE THEY ARE
THtS SPECIFICATION. BETWEEN 2 AND $ METRES FROM SUCH AREAS, SPECIAL SEDIMENT 1A} PROTECTING THEM WITH BARRIER FENCING OR SIMLAR FF “ DRAWING TITLE
féminte
CONTROL MEASURES SHOULD Gf TAKEN 50 MINIMISE POSSIBLE POLLUTION MATERIALS INSTALLED OUTSIDE THE DRIP CINE: be Detad of overlap. .
ALL CONTRACTORS SHALL BE AWARE OF THER TD DOWNSLOPE WATERS, E.G THROUGH INSTALLATION OF SEQIMENT mat
RESPONSIAMLITES FOR PROTECTING THE ENVIRONMENT FROM SOK FENCING, {B) ENSURING THAT WOTHING IS NARED TO THEM: « Oa
EROSION AND POLLUTION TO DOWNSLOPE LANDS AND WATERWAYS. . Unéssturbed area
SEDIMENT CONTROL (C) PROHIBITING PAVING, GRADING, SEDIMENT WASH OR PLACING aw
THESE PLANS PRESENT CONCEPTS ONLY, THE CONTRACTOR SHALL 11. ANY SAND USEO IN THE CONCRETE CURING PROCESS (SPREAD OVER THE OF STOCKPILES WITHIN THE DRIP LINE EXCEPT UNDER THE x
AT ALC TIMES BE RESPONSIBLE FOR THE ESTABLISHMENT h MANAGEMENT SURFACE] WILL BE REMOVED AS SOON AS POSSIBLE AND WITHIN 10 FOLLOWING CONDITIONS.
OF A DETAREO SCHEME MEETING COUNCIL'S APPROVAL, WORKING DAYS FROM PLACEMENT, {@ ENCROACHMENT ONLY OCCURS ON ONE SIDE AND NO CLOSER Sediment Fence, N.T.5.
CONSTRUCTION SEQUENCE 12. WATER WILL BE PREVENTED FROM ENTERING THE PERMANENT DRAINAGE TO THE TRUNK THAW EITHER 1S MEFRES OR HALF THE
§$. THE SOX EROSION POTENTIAL ON THIS SITE SHALL BE MiNP@SED. SYSTEM UNLESS IT 6 SEALED OR OTHERWISE SEDIMENT FREE, THE OISTANCE BETWEEN THE OUTER EDGE OF THE DRIP LOE BLAKENEY ee
HENCE DATIAL WORKS SHALL BE UNDERTAKEN AS A MINIMUM IN ThE HAS BEEN STABRISEO CATCHMENT AREA ANO/OR ANY AND THE TRUNK, WHICH EVER IS THE GREATER Consiruction site ~~ hin, ein. high) CONSULTING ENGINEERS
FOLLOW@IG SEQUENCE PRIOR TO COMMENCING CONSTRUCTION :~ LIKELY SEQRHENT HAS BEEN FILTERED OUT (A ORADWAGE SYSTEM THAT ALLOWS AIR AND WATER TO Berm 10.30
(A) INSTALL ALL TEMPORARY SEDWMENT FENCES AND BARRIER FENCES. 13, TEMPORARY SO AND WATER HANAGEHENT STRUCTURES wae BE CIRCULATE THROUGH THE ROGT ZONE 16.6. A GRAVEL ae ength Sey
WHERE FENCES ARE AQJACENT TO EACH OTHER THE SEDIMENT REMOVED ONLY AFTER THE LANDS THEY ARE PROTECTING ARE BLO} IS PLACEO UNDER ALL FILL LAYERS OF MORE THAN AGN 112013 448
309 MELLMETRES DEPTH
FENCE CAN BE DL ORPORATED NTO THE BARRERA FENCE. STABALISED/REHABLITATED, UI CARE IS TAKEN WOT TO CUT ROOTS UNNECESSARILY OR e2 ao BRISBANE OFFICE:
(B) CONSTRUCT TEMPORARY STABRISED SITE ACCESS. INCLUOING SITE INSPECTION & MAINTENANCE 3D COMPACT THE $0% AROUND THEM iN
SHAKE DOWN AMO WASH PAD . EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED Geotextie ae Oe? PH 041) 515 480
TO EWSURE THAT THEY OPERATE EFFECTIVELY. REPARS AND OR fabric
ICP INSTALL TEMPORARY SEQUMENT TRAPS AND SEOIMENT BASINS. MAINTENANCE SHALL SE UNDERTAKEN REGULARLY AND AS REQURED, o> FAX 07 S479 2675
6 UNDERTAKE SITE DEVELOPMENT WORKS SO THAT LAND PARTICULARLY FOUL OWING STORM EVENTS. roy 50-752 An A 7 Lr
gravel, W/V EMAIL [email protected]
DISTURBANCE IS CONFINES TO AREAS OF MINIMUM WORKABLE SIZE. THE CONTRACTOR SHALL PROVIDE ALL MONITORING CONTROLS & TESTING. Runoff tf: Existing roadway SAR ~ PO Box 1803
7. MAINTAIN ENVIRONMENTAL PROTECTION MEASURES THROUGHOUT CONTRACT
Grected to se trap. TOOWONG QLO 4066
EROSION CONTROL OFFICES:
8. AT ALL TIMES AND IN PARTICULAR OURING WINDY AND ORY
WEATHER, LARGE, UMPADTECTED AREAS WRAL BE KEPT MOST Temporary Site Entry/Exit, ¥.1.S. BRISBANE AND SUNSHINE COAST
DHOT WET) BY SPRINKLING WITH WATER FO KEEP OUST UNDER
CONTROL.
09007 $0.02 A
PROJECT No. OWG Ko. REY.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AB80D.001.pdfRelated documentPublic source context ↗
09/0578 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 857 KB (small file)
- File type
No other editions are linked here.