N \ \\ A COPYRIGHT ~ ALL RIGHTS RESERVED
\ OY \\ Copying ar reproducing the whois or part of this document? in
any form without the written permission of Blakeney Munns
Consulting Engineers constitutes an infcingement af copyright.
Al
> Blakeney Munns Consulting Engineers accepts Ao respensiodity for
the accuracy of for any consequence re.utting from ihe use
oF alteration ot this drawing in electronic form
Drawing: in elecironc (erm should be thethed far accurary against
FS 62 the equivalent revision hard copy issued by Blakeney Munns
Consulting Engineers
5
SS ey : 18 Priore to commencing construction verify all dimensians against
BS oo Archilect’s, other Consultant's and Sub-Contracier's drawings.
Dimeasiona are nat to be scaled or read alectronkally from this
drawing. Setout dimensions, unless specifically shown, are to ba
\ FEE SZ" YY \ Se *ee abtamed from the Architect's of ether Consultant's drawings.
LL \_ | \_\ Fea
\ ; G
Vy AA \ } \ LEGEND
O oy Mi a APR 09
WY Z, Lg PROPOSED BULK EARTHWORKS LEVELS FOLLOWING CARRYING OATE
LA ZI BE 22.00 QUT WORKS IN ACCORDANCE WITH THE EARTHWORKS NOTES ON
Gy Y hh G ORW Cos INCLUDING STRIPPING, PROOF ROLLING AND FILLING.
Ui 2 p Uj UNNS RPEQ No. 4469
Mie Ui ] ; \
Uj UY ; off BULK EARTHWORKS TO BUILDING AREA. ALLOW TD CARRY OUT Bours) MUNN.
Uf THE WORKS IN ACCORDANCE WITH THE EARTHWORKS NOTES ON
Y Uj j ci Y y Ms! ORW (01 INCLUDING STRIPPING, PROOF ROLLING AND FILLING epee. AAG
U Y iY a ‘WITH IMPORTED FILL PROVIDE 1S¢mm THICK SUBBASE [(BR4S}
Y GY Z ‘To | ee Y, LAYER COMPACTED 10 95% MODIFIED ORY OENSITY,
Ui; of ‘ \
Uj N Uj ———— 22.6 PROPOSED BULK EARTHWORKS CONTOUR - INTERMEDIATE
—Y U «|< Z y CAI 7 a ---7=— PROPOSED BULK EARTHWORKS CONTOUR
Y YW ] iy, Ve | lt WY Uys al [0.2m WNTERVAL]
U l 4 Kj} ar ES a \\ Sa EXISTING SURFACE CONTOUR
Ze CH
a PROPOSED KERB LINE IREFER 058071-€63 FOR KERB TYPES)
cf rf
x As | : WU w s EA tartan RETAINING WALL TO STRUCTURAL ENGINEERS DETAR.
iy oA) Z eZ LY TAY? LEY
of G VALAXA i ZA ne Sy 0S ot TEPORARY SCREW PIER RETAINING WALL TO STRUCTURAL
@) GARAG! YN. ; ; f Z] ie ss ENGIWEERS DETAIL.
vin, ZZ)
% ( Lae TZ. I
Y i= NTN \)
Mg NOTES
Z UA | - 4 y! D. IM bes 1 EXISTING EXTERNAL STRUCTURES AND TREES SHOWN ON THESE DRAWINGS FEATURES
is 1A oreo : EXISTING PRIOR TO ANY SEOKMENT AND OfMOLITION WORKS. PT
parawaw. | 2. SHORT TERM BULK EARTHWORKS SLOPE TO BE A MAXIMUM OF 1H-TY, CONTRACTOR TO Po
me A ry of ALLOW FOR ANY REQUIRED SHORING OR PROTECTION TO EXISTING SERVES AND/OR
ADJACENT PROPERTIES OURING EXCAVATION. CONTRACTOR TO ALLOW TO REINS TATE
ols ZA A, 3 Py OR RECTIFY ANY SERVICES AWD/OR ADJACENT PROPERTIES DAMAGED DURING ee ee
Pat zr} EXCAVATION ee ee ee
ZL) “LEVEL 1! SUPERVISION JS REQUIRED FOR ALL EARTHWORKS OPERATIONS AND ee ee
IY A CERTIFICATION IS TO BE PROVIDED BY THE NOMINATED GEOTECHNICAL TESTING Pot
> AUTHORITY FOR THE FOLLOWING ITEMS.
aE HH WT 1 ] Te a | - CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS lie. STRIPPING PROOF a
ROLLING OF SUBGRADE, etc) HAVE SEEN CARRIED OUT IN ACCORDANCE WITH THE
DRAWINGS AND EARTHWORKS SPECIFICATION. a Jor warns arenovat [seks] owe _|
~ CERTICATION THAT THE CONTROLLED FILL IS SUITABLE FOR SUPPORT OF
a CORVENTIDWAL HIGH LEVEL FOOTUIGS AND HAS A MIUMUM BEARING CAPACITY OF es a a
eee AY wzu SOnPa Por Jrreumiwany este |
~ CERTHACATION THAT THE CONTROGLED FILL MATERIAL 6 SUNTARLE TO SUPPORT A
oy CONVENTIONAL SLAB ON GROUND FLOOR [SLAB LOADS OF l0hPa ARE EXPECTEDI. [ INITIALS
a eros ~ CERTFKATION THAT FILL HAS BEEW PLACED AND COMPACTEO TO THE REQUIRED | rey, | AMENDMENT | pate |
MONIHUH DENSITY IN ACCORDANCE WITH THE DRAWINGS AND EARTHWORKS PROPOSED RESIDENCE
SPECIFICATION
~ CERTIFKATION THAT THE QUALITY OF ANY IMPORTED FILL COMPLIES WITH ORAWINGS LOT 10 PARK ROAD
AND THE EARTHWORKS SPECIFICATION REQUIREMENTS.
CONTRACTOR TO PROVIDE AX EARTHWORKS METHODOLOGY STATEMENT FOR APPROVAL NOOSA HEADS
BY BMCE CONSULTING ENGINEERS PRIOR TO COMMENCING WORK ON SITE. THE
METHODOLOGY STATEMENT SHALL OEMONSTRATE THE TREATMENT OF £XIG TING FELL, QLD 4567
SITE TRAFFICABRLITY AND BICORPORA TION OF REQUIRED SEDIMENT AND EROSION
RP 0.87545 eT WORKS, CONTRACTOR TO ALLOW TQ ATTEND AN OW SITE PRE-START MEETING AND TO PROJECT
EXCAVATE TEST PITS AS RECUIRED TO DEMONSTRATE THE APPROPRIATENESS OF THE
ME THOOOLOGY STATEMENT.
CONTRACTOR TO ENSURE PRESERVATION AND AVOID DISTURBANCE OF EXISTING THE PENINISULA AVIATION
ks
SURVEY MARKS. TRUST
sa BULK EARTHWORKS-BUILDING PLATFORM LAYOUT PLAN THE CONTRACTOR TO ENSURE ALL FIRE ANT CONTROLS OR RESTRICTIONS ON THIS SITE CLIENT,
On ASSOCIATED REQUIREMENTS HAVE BEEN COMPLIEO WITH.
SCALE 1: 100 REFER ELECTRICAL ENGINEERS ORGS FOR BULK EARTHWORKS DETAILS FOR PHT CECILIA BROWN DESIGN
REFER ELECTRICAL DRAWING FOR CONDUITS, CONDUITS TO BE INSTALLED PRIOR TO
PAVEMENTS.
ARCHOTECT
THE CONTRACTOR [5 TO MAINTAIN ALL ACCESS ROADS TO SITE SUCH THAT THEY
REMAIN FREE OF ALL FOL MATERIAL AND ARE CLEANED AS NECESSARY. REFER ALSO TO BULK EARTHWORKS-
THE EROSION SEDIMENT CONTROL PLAN / PROGRAM.
BUILDING PLATFORM PLAN
ORAWING TITLE
BLAKENEY MUNNS
CONSULTING ENGINEERS
ACN 112013 4465
BRISBANE OFFICE:
PH 0411 515 480
FAX 07 5479 2675
EMAIL [email protected]
PO Box 1803
TOOWONG QLD 4066
OFFICES:
BRISBANE ANO SUNSHINE COAST
09007 $0.03 A
PROJECT No OWG No. REV.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AB80D.001.pdfRelated documentPublic source context ↗
09/0578 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 857 KB (small file)
- File type
No other editions are linked here.