Original source · versioned page text
Planner's Report
CURRENT CONDITION COMMENT / REQUIRED CHANGE TO CONDITION
revised Building Envelope Plan for Lots 32, 33, 34, 35,
39 and 40.
12. For all two (2) storey dwellings on Lots 16, 20, 21, Condition 12 needs to be updated to reflect the
22, 50 and 51, an acoustic report must be prepared revised layout as follows:
by a qualified person* recommending design,
material and construction requirements to achieve 12. For all two (2) storey dwellings on Lots 32, 33, 34,
internal noise levels recommended by Australian 35, 36 and 40 16, 20, 21, 22, 50 and 51, an acoustic
Standard AS2107:2000 within habitable rooms using report must be prepared by a qualified person*
the methodology of AS 3671: 1989 and all such recommending design, material and construction
dwellings must be constructed to these standards. requirements to achieve internal noise levels
The acoustic report must be submitted to Council recommended by Australian Standard AS2107:2000
prior to the issue of a building approval. within habitable rooms using the methodology of AS
*(Refer to Advisory Note) 3671: 1989 and all such dwellings must be constructed
to these standards. The acoustic report must be
submitted to Council prior to the issue of a building
approval.
15. Park allotments east of Walter Hay Drive must be Condition 15 will need to be updated to reflect the
dedicated to Council with Stage 4 of the revised layout and staging boundaries as follows:
development.
15. Park allotments east of Walter Hay Drive must be
dedicated to Council with Stage 4 Stage 3 of the
development.
Road Dedication / Closure Hollett Road
CIVIL ENGINEERING
External Works
18. Hollett Road must be upgraded for the length of Condition 18 needs to be updated to reflect the
its frontage to the subject site and extending to the revised layout and staging boundaries as follows:
west to Eumundi Noosa Road. The works must be
undertaken in 18. Hollett Road must be upgraded for the length of its
accordance with an Operational Works approval for frontage to the subject site and extending to the west
the relevant stage and must include in particular: to Eumundi Noosa Road. The works must be
(a) Stage 1 - that part of Hollett Road extending from undertaken in
the prolongation of the eastern boundary of Lot 9 to accordance with an Operational Works approval for
the existing formation of Hollett Road at a point the relevant stage and must include in particular:
approximately 100 metres from Eumundi Noosa Road (a) Stage 1 - that part of Hollett Road extending from
must be: the prolongation of the eastern boundary of Lot 2 9 to
(i) Designed and constructed with a 7 metre wide the existing formation of Hollett Road at a point
kerb to kerb formation (flush kerb may be used approximately 100 metres from Eumundi Noosa Road
where applicable); must be:
(ii) Constructed such that it is immune from flooding (i) Designed and constructed with a 7 metre wide kerb
during a peak 10 year ARI event and has maximum to kerb formation (flush kerb may be used where
depth of inundation of 250 mm and DV < 0.6 during a applicable);
peak 100 year ARI flood event. Crossings shall be (ii) Constructed such that it is immune from flooding
constructed such that there are no offsite flood during a peak 10 year ARI event and has maximum
impacts on land not owned by Council. Further, the depth of inundation of 250 mm and DV < 0.6 during a
road crossings shall be constructed such that they do peak 100 year ARI flood event. Crossings shall be
not change the standing water level within the land constructed such that there are no offsite flood impacts
upstream of the road; on land not owned by Council. Further, the road
JFP Ref: M1775 Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.