Noosa Icanic Panel Decision Notice — Approval with conditions
Material change of use (Visitor Accommodation Type 4 - Conventional, Entertainment &
Dining Business Type 1 — Food & Beverages, & Retail Business Type 2 - Shop & Salon)
9,11, 13 & 19 Hastings Street, Noosa Heads
, . 21 May 2009
89.3.2 Vibration
89.3.3 Dust
89.3.4 Odours and exhausts control;
89.4 Employee and contractor induction and education processes; &
89.5 Measures for the remediation of the site to the satisfaction of Council in the
event that a substantial delay occurs after the existing development is
demolished and before construction begins.
90. A Traffic Management Plan for each separate demolition and construction phase of the
development shall be submitted to and approved by Council at least 5 working days
prior to the commencement of any Demolition or Building works or at least 5 working
days prior to the pre-start meeting for Operational Works. The Traffic Management
Plan shall include but not be limited to:
90.1 Limiting the routes for the heavy vehicles to the major road network and
prohibit the use of the local roads as access to the site;
90.2 Maintaining pedestrian access and safety along the site’s Hastings Street
frontage;
90.3. Indicate provision for on-site and off-site parking and shuttle buses for the
required workforce;
90.4 Indicate the location of loading and unloading areas,
90.5 Indicate the location of any “holding” areas for heavy vehicles and
90.6 Operating hours.
91. Demolition of the existing development(s) on the site shall not be undertaken during
the peak Christmas School Holiday period.
92. Construction and Demolition staff shall not park within the Hastings Street area,
, including the surrounding streets, Lions Park or Noosa Parade. Parking shall either be
on site or at a suitable off-site location serviced via a shuttle bus. Details shall be
included in the Traffic Management Plans for the site.
Erosion and Sediment Control
93. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access to
the site and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development 7
Permit for Operational Works. :
General (Engineering)
94. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. In this regard a DXF/DWG file on
GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
Page 13 of 20See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A9301.001.pdfRelated documentPublic source context ↗
08/1787 - Decision Notice & Approved Plans - Noosa Iconic Panel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.