Council archive · source document
07/1881 - Operational Works - Landscaping [As Published] · 142007.1881
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 10 12. 13. 14. 15. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to cal! upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The Development Permit for a material change of use of premises lapses if the use has not happened by 9 August 2011, unless an application to extend the currency is approved by Council. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. Land Development Vehicle Access 16. A vehicular access driveway shall be constructed from the Grant Street frontage of the site with a maximum width of 4.5m. 17. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do not comply with AS2890.1-2004 Council will require that the driveway be removed and reconstructed to levels that do comply. 18. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight tine requirements as defined in AS2890.1, section 3.2.4. The applicant shall demonstrate compliance by illustrating these sight lines on the plans submitted for both Operational Works approval and Building Works approval. 19. All vehicles shall enter and leave the site in a forward direction. Car Parking 20. Carparking shall be provided within the site as shown on drawing number 07-3646 dated 31/01/07 by Burleigh Design Drafting except as modified herein. 21. Aminimum of 3 car parking spaces shall be provided on-site, with at least one space being available for visitor parking. 22. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. Frontage Works 23. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Grant Street frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines. 24. Anew 1.5m wide concrete path shall be constructed from the Grant Street kerb to the proposed front gate of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. MG j:\datawrks\wrkcache\1417946\d1544decnotice 153171.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1881 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.