Original source · versioned page text
RFI - ATTACHMENT A - SBSMP - Rev 2
Very large file: it may take a few minutes
The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
Stormwater Drainage Design
PO1 AO1 RO1
The development and its stormwater A stormwater management plan is prepared The proposal complies. Refer to the Site
management system is planned and designed consistent with PSP6 Engineering Design Based Stormwater Management Plan
having regard to: Standards - Roads, drainage and (SBSMP) report prepared by MCE.
(a) the natural features of the site; earthworks.
(b) the need to avoid impacts and potential risks
to ecologically important areas;
(c) the likely effectiveness of erosion and
sediment control and stormwater drainage
measures during rainfall events during and
post construction; and
(d) the need to protect environmental values
and water quality of receiving waters both
during and post construction
PO2 AO2.1 RO2.1
Stormwater drainage infrastructure is planned, Stormwater drainage planning, design and All stormwater design will comply with
designed and construction is in accordance with PSP6 the PSP6 Engineering Design Standards
constructed to: Engineering Design Standards - Roads, - Roads, drainage and earthworks and
(a) incorporate allowance for increased flood drainage and earthworks and the latest the latest version of the Queensland
risk and tidal inundation through pipework as version of the Queensland Urban Drainage Urban Drainage Design Manual.
a result of cilmate change and sea level rise; Design Manual.
(b) ensure the development is adequately AO2.2 RO2.2
drained; and The stormwater drainage system connects to Refer to the SBSMP prepared by MCE
(c) ensure stormwater is managed and lawfully a lawful point of discharge in accordance for the lawful points of discharge.
discharged without altering stormwater with PSP6 Engineering Design Standards -
drainage characteristics external to the site. Roads, drainage and earthworks.
AO2.3 RO2.2
Stormwater flows discharging from the The proposal complies. A detention basin
development are demonstrated to be will be utilised to mitigate flows prior to
consistent with pre-development discharge to the legal point of discharge.
characteristics. Refer to the SBSMP prepared by MCE.
AO2.4
Development provides for the management N/A
of stormwater to incorporate appropriate
1
Solution: Acceptable Solution Page 1 of 10
A/S Alternative Solution D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
N/A Not applicable to this proposal Job: 20169
Rev: 0
Site Address: 101-105 Eumundi Noosa Road, Noosaville 30/11/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.