Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

RFI - ATTACHMENT A - SBSMP - Rev 2

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                         phosphorous, 45% reduction in total nitrogen
                                                         and 90% reduction in gross pollutants >5mm)

                                                         OR
                                                         AO6.3
                                                         Developments achieve a minimum 3 drop
                                                         rating consistent with the Water by Design
                                                         Living Waterways Scoring Guide (Healthy
                                                         Land and Water).
                                                                                                                    N/A
                                                         Editor’s note— PSP6 Engineering Design
                                                         Standards - Roads, Drainage and
                                                         Earthworks provides guidance on stormwater
                                                         design and modelling requirements

PO7                                                      AO7.1
Water quality treatment systems use natural              Water quality treatment systems are
processes and materials, whenever possible, and          designed to be integrated into the landscape
are integrated into development to enhance               consistent with the technical design guideline
biodiversity and landscape benefits                      published by Healthy Land and Water Water
                                                         by Design for the                                          N/A
                                                         feature. (eg. For Bioretention Basins:
                                                         Bioretention Technical Design Guidelines
                                                         (October 2014) and for Wetland Systems the
                                                         Wetland Technical Design Guideline (May
                                                         2017).
PO8                                                      AO8.1
Water quality treatment infrastructure to be             Detailed life cycle costing is provided for the
                                                                                                                    N/A
dedicated as public assets are proven to be              entire treatment train system including
suitable for its use and of a cost                       replacement costs of asset parts.
effective and efficient standard                         AO8.2
                                                         Treatment systems dedicated as public
                                                         assets are designed to minimise
                                                                                                                    N/A
                                                         maintenance, renewal and adaption costs
                                                         and the requirement for specialised
                                                         equipment, material or maintenance

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 4 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                   30/11/2020
Log in to download the original file

RFI - ATTACHMENT A - SBSMP - Rev 2.pdf · 13.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.