4.2 Existing Drainage Patterns
Data obtained from Noosa Council’s records and detailed site survey indicate that the site has
the following drainage patterns:
Roofwater Runoff
1. The existing commercial building roofwater appears to travel underground and connect
into the existing structure located within the driveway access of Lot 61 on RP69404. Hence,
the roofwater from the existing commercial building was discharged to the Eumundi Noosa
Road kerb and channel.
2. A review of the street frontage of the site along Eumundi Noosa Road indicated that there
is no kerb outlet for Lot 1 on RP849431. Hence, it is assumed that roofwater from the
existing residential building is discharged to the ground or to the existing underground
stormwater infrastructure at the rear of the site via downpipes.
Surface Runoff
1. Surface runoff from the rear portion of Lot 1 on RP230931 generally sheet flows towards
the adjacent site on Lot 61 on RP69404, north and east of the site.
2. Surface runoff from the front portion of Lot 1 on RP230931 generally sheet flows towards
the Eumundi Noosa Road kerb and channel.
3. Surface runoff from Lot 1 on RP849431 generally sheet flows south east towards Lot 46 and
62 on SP132578.
External Catchment
1. There appears to be no external catchment entering the site.
4.3 Lawful Point of Discharge
If the proposed development maintains pre-development flow conditions, the lawful point of
discharge for the proposed development is the existing stormwater drainage infrastructure within
Lot 46 and 62 on SP132578, southeast of the site and the Eumundi Noosa Road kerb and channel.
In consideration of the site characteristics, surrounding topology and stormwater drainage
infrastructure, the aforementioned proposed lawful point of discharge is considered to be
compliant with the criteria for lawful point of discharge outlined in Section 3.9.1. of QUDM 2017
as per below:
i) The location of the proposed discharge point is under the lawful control of the local
government or other statutory authority from whom permission to discharge has been
received.
ii) The post development discharge will not cause an actionable nuisance, nor environmental
or property damage, as it is intended to implement measures to account for any change to
the existing flow characteristics.
iii) Authority to discharge over affected properties will not be required as the proposed
development will discharge directly into the existing waterway and will be maintained as
per existing drainage conditions.
Refer to Section 5 outlining the Stormwater Quantity aspects of this site and Appendix D for the
Water Quality and Drainage Code.
Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.