Our Ref: 20169
Council Ref: MCU20/0150.01

Wednesday, 13 October 2021

Noosa Shire Council
PO Box 141
Tewantin QLD 4565

Attention: Patrick Murphy

RE:       Information Request Response – Bioretention Basin Design, Rainwater Tanks, Flow
          Concentration and Climate Change
          Proposed Townhouse Development at 101 & 105 Eumundi Noosa Road, Noosaville

In reply to the information request issued by Noosa Shire Council on 20 September 2021, we
provide the following information and response:

Item 1:       Demonstrate how PO7, AO7.1, PO9 and AO9.2 of the Water Quality and Drainage
              Code will be achieved. In particular, how visual integration, safety and
              maintenance access are achieved in the proposed design.

Response: Refer to the updated Stormwater Management Details (20169-SK12-D and 20169-
          SK13-D) attached to the updated Site Based Stormwater Management Plan
          (20169-SBSMP-Rev 4) which incorporates a 1 in 4 maintenance access ramp for
          each bio-retention/detention basin for maintenance staff to access the base of
          each basin. In accordance with Table 13 of the Bioretention Basin Technical
          Design Guidelines by Water by Design, catchments less than 2ha do not require a
          sediment forebay. However, scour protection has been provided at the inlets
          into the basins. It is anticipated that a safety fence will be installed around the
          perimeter of each basin and a lockable gate located at the maintenance access
          ramp to prevent public access. In addition, education signage will be installed at
          each basin location to inform the residences of the function each basin provides.
          Refer to the landscape architectural drawings for the proposed landscaping
          design surrounding the basin areas.

Item 2:       Update the SWMP to state all assumptions regarding the rainwater tank and
              reuse, including a plan showing communal landscaped areas intended to be
              irrigated. This is required so that hydraulic services plans can accurately reflect
              the SWMP intent.

Response: Refer to section 6.3.2 of the attached updated Site Based Stormwater
          Management Plan (20169-SBSMP-Rev 4) outlining the landscaping areas of the
          site that the rainwater tank is intended to irrigate.

 D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Correspondence\Letters\21-10-13 - 20169 - RFI
Response.doc
Log in to download the original file

RFI -21-10-13 - 20169 - RFI Response.pdf · 273 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

                                                                      MORGAN CONSULTING
                                                                     E NGINEERS P TY LTD
                                                                                      20169
                                                                                      Page 2




Item 3:   Investigate and confirm the existing discharge patterns from the development
          site in the North-Eastern corner of the proposed development and demonstrate
          that the design will not result in any changes in flow patterns or discharge onto
          additional land which is not inundated by stormwater runoff from the site in the
          existing case.

Response: The existing drainage catchment and flows have been demonstrated on the
          updated Concept Stormwater Catchment Plan (20169-SK20-E) for the north
          eastern corner of the site. As shown in the updated Stormwater Management
          Details – Sheet 2 (20169-SK13-D) all flows up to Q100 are contained within the
          basin. The high flow weir has been designed as the top of the proposed pit
          structure within the basin. The proposed weir overflow over the retaining wall
          across the boundary will be in emergency cases only. Therefore, all flows up to
          Q100 is not expected to inundate downstream properties.

          The wall of the basin has also been set back 300mm from the downstream
          boundary to ensure that any overflow has an opportunity to return to existing
          conditions prior to crossing the boundary.

          Furthermore, a site investigation reveals that the existing earth bund does not
          exist and it is more so a local depression surrounding the existing stormwater
          pit. Therefore, it is expected that any stormwater runoff (likely in major storm
          events) exceeding the capacity of the existing pit will likely surcharge and sheet
          flow across boundaries of Lot 79 and 80, meaning that the proposed basin will
          improve drainage conditions across the boundary as a result of withholding flows
          up to Q100 storm events.

Item 4:   Investigate and confirm the existing discharge patterns from the development
          site in the South-Eastern corner of the proposed development and demonstrate
          that the design will not result in any changes in flow patterns or discharge onto
          additional land which is not inundated by stormwater runoff from the site in the
          existing case. Confirm the weir design is able to be realised within normal
          construction tolerances.

Response: The existing drainage catchment and flows have been demonstrated on the
          updated Concept Stormwater Catchment Plan (20169-SK20-E) for the south
          eastern corner of the site. As shown in the updated Stormwater Management
          Details – Sheet 1 (20169-SK12-D) all flows up to Q100 are contained within the
          basin. The high flow weir has been designed as the top of the proposed pit
          structure within the basin. Therefore, the proposed weir overflow over the
          retaining wall across the boundary will be in emergency cases only. It is
          anticipated that the weir design is able to be constructed within normal
          construction tolerances. Flows will not inundate properties that are not
          currently inundated.

Page 3

                                                                        MORGAN CONSULTING
                                                                       E NGINEERS P TY LTD
                                                                                     20169
                                                                                     Page 3




           The wall of the basin has also been set back 300mm from the downstream
           boundary to ensure that any overflow has an opportunity to return to existing
           conditions prior to crossing the boundary.

Item 5:    Provide an updated SWMP which includes stormwater detention modelling and
           updated drainage designs which includes allowance for the 1%AEP event at end of
           planning period 2100.

Response: Refer to section 5.4.5 of the attached updated Site Based Stormwater
          Management Plan (20169-SBSMP-Rev 4) for the considerations in regards to the
          allowance for the 1%AEP event at end of planning period 2100.

Please contact me if you have any further queries on (07) 3369 8411.

Yours faithfully,

MORGAN CONSULTING ENGINEERS PTY LTD



Henry Morgan
Director

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.