RFI -21-10-13 - 20169 - RFI Response
MORGAN CONSULTING
E NGINEERS P TY LTD
20169
Page 2
Item 3: Investigate and confirm the existing discharge patterns from the development
site in the North-Eastern corner of the proposed development and demonstrate
that the design will not result in any changes in flow patterns or discharge onto
additional land which is not inundated by stormwater runoff from the site in the
existing case.
Response: The existing drainage catchment and flows have been demonstrated on the
updated Concept Stormwater Catchment Plan (20169-SK20-E) for the north
eastern corner of the site. As shown in the updated Stormwater Management
Details – Sheet 2 (20169-SK13-D) all flows up to Q100 are contained within the
basin. The high flow weir has been designed as the top of the proposed pit
structure within the basin. The proposed weir overflow over the retaining wall
across the boundary will be in emergency cases only. Therefore, all flows up to
Q100 is not expected to inundate downstream properties.
The wall of the basin has also been set back 300mm from the downstream
boundary to ensure that any overflow has an opportunity to return to existing
conditions prior to crossing the boundary.
Furthermore, a site investigation reveals that the existing earth bund does not
exist and it is more so a local depression surrounding the existing stormwater
pit. Therefore, it is expected that any stormwater runoff (likely in major storm
events) exceeding the capacity of the existing pit will likely surcharge and sheet
flow across boundaries of Lot 79 and 80, meaning that the proposed basin will
improve drainage conditions across the boundary as a result of withholding flows
up to Q100 storm events.
Item 4: Investigate and confirm the existing discharge patterns from the development
site in the South-Eastern corner of the proposed development and demonstrate
that the design will not result in any changes in flow patterns or discharge onto
additional land which is not inundated by stormwater runoff from the site in the
existing case. Confirm the weir design is able to be realised within normal
construction tolerances.
Response: The existing drainage catchment and flows have been demonstrated on the
updated Concept Stormwater Catchment Plan (20169-SK20-E) for the south
eastern corner of the site. As shown in the updated Stormwater Management
Details – Sheet 1 (20169-SK12-D) all flows up to Q100 are contained within the
basin. The high flow weir has been designed as the top of the proposed pit
structure within the basin. Therefore, the proposed weir overflow over the
retaining wall across the boundary will be in emergency cases only. It is
anticipated that the weir design is able to be constructed within normal
construction tolerances. Flows will not inundate properties that are not
currently inundated.
See the original