Original source · versioned page text
RFI -21-10-13 - 20169 - RFI Response
Our Ref: 20169 Council Ref: MCU20/0150.01 Wednesday, 13 October 2021 Noosa Shire Council PO Box 141 Tewantin QLD 4565 Attention: Patrick Murphy RE: Information Request Response – Bioretention Basin Design, Rainwater Tanks, Flow Concentration and Climate Change Proposed Townhouse Development at 101 & 105 Eumundi Noosa Road, Noosaville In reply to the information request issued by Noosa Shire Council on 20 September 2021, we provide the following information and response: Item 1: Demonstrate how PO7, AO7.1, PO9 and AO9.2 of the Water Quality and Drainage Code will be achieved. In particular, how visual integration, safety and maintenance access are achieved in the proposed design. Response: Refer to the updated Stormwater Management Details (20169-SK12-D and 20169- SK13-D) attached to the updated Site Based Stormwater Management Plan (20169-SBSMP-Rev 4) which incorporates a 1 in 4 maintenance access ramp for each bio-retention/detention basin for maintenance staff to access the base of each basin. In accordance with Table 13 of the Bioretention Basin Technical Design Guidelines by Water by Design, catchments less than 2ha do not require a sediment forebay. However, scour protection has been provided at the inlets into the basins. It is anticipated that a safety fence will be installed around the perimeter of each basin and a lockable gate located at the maintenance access ramp to prevent public access. In addition, education signage will be installed at each basin location to inform the residences of the function each basin provides. Refer to the landscape architectural drawings for the proposed landscaping design surrounding the basin areas. Item 2: Update the SWMP to state all assumptions regarding the rainwater tank and reuse, including a plan showing communal landscaped areas intended to be irrigated. This is required so that hydraulic services plans can accurately reflect the SWMP intent. Response: Refer to section 6.3.2 of the attached updated Site Based Stormwater Management Plan (20169-SBSMP-Rev 4) outlining the landscaping areas of the site that the rainwater tank is intended to irrigate. D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Correspondence\Letters\21-10-13 - 20169 - RFI Response.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.