RFI -21-10-13 - 20169 - RFI Response
MORGAN CONSULTING
E NGINEERS P TY LTD
20169
Page 3
The wall of the basin has also been set back 300mm from the downstream
boundary to ensure that any overflow has an opportunity to return to existing
conditions prior to crossing the boundary.
Item 5: Provide an updated SWMP which includes stormwater detention modelling and
updated drainage designs which includes allowance for the 1%AEP event at end of
planning period 2100.
Response: Refer to section 5.4.5 of the attached updated Site Based Stormwater
Management Plan (20169-SBSMP-Rev 4) for the considerations in regards to the
allowance for the 1%AEP event at end of planning period 2100.
Please contact me if you have any further queries on (07) 3369 8411.
Yours faithfully,
MORGAN CONSULTING ENGINEERS PTY LTD
Henry Morgan
Director