Decision Notice MCU26 0034 & OPW26 0056 (As Published) · MCU26/0034
Plan No. Rev. Plan/Document Name Date
Sheet 1 of 2 A Site Plan 02/04/2026
Prepared by Kunkel Building Design
Sheet 2 of 2 A Floor Plan, Floor Framing Plan & Typical Section 02/04/2026
Prepared by Kunkel Building Design
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 25 June 2028,
unless an application to extend the currency period is approved by Council.
Site Specific Conditions
3. All elements of the existing jetty, both above and below water level, must be wholly removed
as part of these works.
Performance Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Bonds
5. Bonds must:
a. meet the requirements of Council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
General Conditions
6. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure must not exceed 2 vessels.
7. The use of the jetty must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise.
8. All vessels berthed/moored at the jetty must be located a minimum of 1.0 metre from the
prolongation of the property boundaries.
9. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
10. Boat repair activities are not permitted on site.
11. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
12. All structures must have no detrimental effects on stormwater drains and/or easements.
13. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
14. A rigid handrail must be fitted on one side of the walkway. The handrail must be of an open
design and in accordance with the approved plans.
Page 2 of 6
Document Set ID: 24898657
Version: 2, Version Date: 25/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice MCU26 0034 & OPW26 0056 (As Published).pdfRelated documentApplication case desk ↗
Decision Notice MCU26 0034 & OPW26 0056 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 147 KB (small file)
- File type
No other editions are linked here.