Decision Notice MCU26 0034 & OPW26 0056 (As Published) · MCU26/0034

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

               15.    No posts or vertical supports of the proposed jetty are to extend vertically from the structure
                      unless they provide necessary support for the` handrail.
               16.    No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
                      elevating a vessel above the water without Council approval.
               17.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               18.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               19.    Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
                      5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
                      a.      Located clear of this rock protection where applicable, or alternatively
                      b.      Where the scour protection extends beyond 750mm:
                              i.       Prior to driving piles, the rocks are to be removed to expose the geotextile and
                                       the geotextile cut neatly to allow it to be turned back. During pile driving, care is
                                       to be taken to ensure the geotextile is not damaged. At the completion of pile
                                       driving, the fabric is to be turned down around the pile and the rocks replaced
                                       around the piles
               20.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               21.    The mooring facility must not be utilised for live-aboard purposes.
               22.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               23.    Certification by a Registered Professional Engineer of Queensland that states that the
                      jetty/boatlift is constructed in accordance with best practice methods and is structurally sound
                      must be submitted to Council. This certification must be submitted to Council within three (3)
                      months of the completion of the works. A final inspection and approval of the structure by
                      Council’s Inspector is also required. Please contact Council’s Development Assessment
                      Branch on 5329 6500 to arrange the inspection.
               24.    This approval lapses where the construction of the jetty has not commenced within two (2)
                      years of the date of issue of the approval, unless application is made and approved by
                      Council for an extension.
               25.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans.
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.



                                                                                                              Page 3 of 6
Document Set ID: 24898657
Version: 2, Version Date: 25/06/2026

Used in these records

About this file

File size
147 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice MCU26 0034 & OPW26 0056 (As Published).pdf · 147 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.