Original source · versioned page text
RECOR Preliminary Stormwater Management Report - 20220198
INTRODUCTION RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application for a residential development located at 3 Delorme Street, Noosa Heads. This report investigates the stormwater management considerations for the existing and proposed development site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council requirements for stormwater drainage. Project number 20220198 File RECOR Preliminary Stormwater Management Report - 20220198, 2022-08-19 Page 4 of 15 Revision 1 P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.