RECOR Preliminary Stormwater Management Report - 20220198
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Delorme Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.021 0.024 0.003 14%
50% 0.025 0.028 0.003 12%
0.2 EY 0.039 0.041 0.002 5%
10% 0.045 0.050 0.005 11%
5% 0.057 0.057 0.000 0%
2% 0.065 0.065 0.000 0%
1% 0.071 0.072 0.001 1%
As expected, the site has increased the total peak flows from the site for the majority of storm events. Attenuation
will be required to mitigate the outflows to ensure that the development does not exceed the predevelopment levels
to minimise impacts to the downstream environment.
The mitigated post-development model splits the catchment into a roof area, which drains to an on-site detention
(OSD) tank, and the remainder of the site which is not attenuated. An iterative process was used to determine a
suitable configuration of storage volume, low-flow, and high flow pipe outlets for the OSD to deliver the required
reduction of the flow rates from the site.
The result of the iterative sizing process determined that the OSD storage will need to provide an attenuation
capacity of 3,000L for each unit with the maximum possible roof area to be plumbed to the tank. A low flow outlet
consisting of a 57mm orifice plate is to be provided the base of the tank, and a 100mm high flow outlet at the head
of the tank will provide discharge for larger storm events.
Using this mitigated development model, the proposed developed flows were again compared to the existing state
as shown below in Table 3.2 Existing and proposed mitigated site peak discharge rates.
Table 3.2 Existing and proposed mitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qmitigated Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.021 0.021 0.000 0%
50% 0.025 0.024 -0.001 -4%
0.2 EY 0.039 0.033 -0.006 -15%
10% 0.045 0.041 -0.004 -9%
5% 0.057 0.049 -0.008 -14%
2% 0.065 0.063 -0.002 -3%
1% 0.071 0.071 0.000 0%
As the total peak flows are equal to or below the existing site conditions for all storm events, the proposed OSD area
will provide the mitigation required for the peak flow storm events from the development.
Project number 20220198
File RECOR Preliminary Stormwater Management Report - 20220198, 2022-08-19 Page 9 of 15
Revision 1
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.